岩土工程

顺层岩质边坡稳定性极限平衡分析方法比较研究

  • 段永伟 ,
  • 胡修文 ,
  • 吁燃 ,
  • 卢阳
展开
  • 1.中国地质大学武汉工程学院,武汉430074;
    2.贵州省交通规划勘察设计院,贵阳550001;
    3.中国科学院水利部成都山地灾害与环境研究所,成都610041
段永伟(1987-),男,河南南阳人,硕士研究生,主要从事岩土体稳定性分析评价与利用方面的研究,(电话)15002716906(电子信箱)duanyongwei1212@126.com

收稿日期: 2012-12-27

  修回日期: 2013-12-10

  网络出版日期: 2013-12-10

Comparative Study on Limit Equilibrium Methods forStability Analysis of Bedding Rock Slope

  • DUAN Yong-wei ,
  • HU Xiu-wen ,
  • YU Ran ,
  • LU Yang
Expand
  • 1.Faculty of Engineering,China University of Geosciences,Wuhan 430074,China;
    2.Guizhou Transportation Planning Survey and Design Co.,Ltd.,Guiyang 550001,China;
    3.Institute of Mountain Hazard and Environment,Chinese Academy of Sciences,Chengdu 610041,China

Received date: 2012-12-27

  Revised date: 2013-12-10

  Online published: 2013-12-10

摘要

顺层岩质边坡是影响工程岩体稳定性、导致地质灾害发生的典型边坡岩体结构类型。顺层岩质边坡的稳定性是边坡研究的重要内容。不平衡推力法、Sarma法和直线型分析法是应用广泛的边坡稳定性分析方法,在介绍这3种方法的基础上,以宜巴高速舒家槽大桥桥基顺层岩质边坡为研究对象,分析边坡岩体结构特征和破坏情况,运用这3种方法分析边坡的稳定性,并与边坡岩体结构特征和破坏情况进行比较分析。研究结果表明:Sarma法稳定性分析结果与边坡实际破坏情况非常吻合,更适合于节理裂隙发育的顺层岩质边坡的稳定性分析;不平衡推力法计算结果偏大;直线型分析法结果偏小,较保守。

本文引用格式

段永伟 , 胡修文 , 吁燃 , 卢阳 . 顺层岩质边坡稳定性极限平衡分析方法比较研究[J]. 长江科学院院报, 2013 , 30(12) : 65 -68 . DOI: 10.3969/j.issn.1001-5485.2013.12.012

Abstract

Bedding rock slope is a typical rock mass structure which influences the stability of engineering rock mass and leads to geological hazards. Several methods of slope stability analysis,namely,Sarma Method,Imbalance Thrust Force Method,and Linear Sliding Surface Method,are compared in this paper. With the bedding rock slope at the bridge foundation of Shujiacao Bridge of Yichang-Badong Highway as an example,the rock slope stability was analyzed by these three methods. The analyzed results were compared with the actual rock mass structure and damage of this bedding rock slope. The comparison shows that the result by Sarma method consists well with the actual situation of slope failure,it is more suitable for analyzing bedding rock slope with joint fissures; whereas the calculation result of Imbalance Thrust Force Method is larger,and Linear Sliding Surface Method is conservative and smaller.

参考文献

[1] 成永刚.万(州)-梁(平)高速公路K34~K59段滑坡成因分析[J].中国地质灾害与防治学报,2004,15(2):11-14.(CHENG Yong-gang. Genetic Mechanism Analysis for Landslides between 34 to 59 kilometers of the Wanzhou-Liangping Expressway[J].The Chinese Journal of Geological Hazard and Control, 2004,15(2):11-14.(in Chinese)
[2] 廖秋林,李 晓,李守定,等.三峡库区千将坪滑坡的发生、地质地貌特征、成因及滑坡判据研究[J].岩石力学与工程学报,2005,24(17):3146-3152. (LIAO Qiu-lin,LI Xiao, LEE S T,et al. Occurrence,Geology and Geomorphy characteristics and Origin of Qianjiangping Landslide in Three Gorges Reservoir Area and Study on Ancient Landslide Criterion[J]. Chinese Journal of Rock Mechanics and Engineering,2005,24(17):3146-3152.(in Chinese)
[3] 徐 青,陈士军,陈胜宏.滑坡稳定分析剩余推理法改进研究[J].岩土力学,2005,26(3) :465-470.(XU Qing, CHEN Shi-jun,CHEN Sheng-hong. Study on the Improved Residual Thrust Method for Landslide Stability Analysis[J]. Rock and Soil Mechanics,2005,26(3):465-470.(in Chinese)
[4] 沙爱民.路基路面工程[M].北京:高等教育出版社,2011.(SHA Ai-min. Subgrade and Pavement Engineering[M]. Beijing:Higher Education Press,2011.(in Chinese)
[5] Sarma S K. Stability Analysis of Embankments and Slopes[J]. Geotechique,1973,23(3);423-433.
[6] 张鲁渝,郑颖人,时卫民.边坡稳定分析中关于不平衡推力法的讨论[J].岩石力学与工程学报,2005,24(1):177-182.(ZHANG Lu-yu,ZHENG Ying-ren, SHI Wei-min. On Slope Stability Analysis by Imbalance Thrust Force Method [J]. Chinese Journal of Rock Mechanics and Engineering,2005,24(1):177-182.(in Chinese)
[7] GB 50021—2001,岩土工程勘察规范[S].北京:中国建筑工业出版社,2002.(GB50021—2001,Code for Geotechnical Investigation[S]. Beijing:China Architecture and Building Press,2002.(in Chinese)
[8] 谭儒蛟,李明生,张建根,等.岩质边坡最危险滑裂面的GA-Sarma算法研究[J].岩石力学与工程学报,2010,29(1):2866-2871.(TAN Ru-jiao,LI Ming-sheng,ZHANG Jian-gen,et al. Study of GA-Sarma Algorithm of Critical Slip Surface of Rock Slope[J]. Chinese Journal of Rock Mechanics and Engineering,2010,29(1):2866-2871.(in Chinese)
[9] 张强勇,刘大文,蔡德文.Sarma法在加锚岩质高边坡安全稳定性评价分析中的应用[J].岩石力学与工程学报,2005,24(18):3368-3372.(ZHANG Qiang-yong,LIU Da-wen,CAI De-wen. Application of Sarma Method to Stability Evaluation Analysis of Large Anchored Rock Mass Slope[J]. Chinese Journal of Rock Mechanics and Engineering,2005,24(18):3368-3372.(in Chinese)
[10]于书翰.道路工程[M].武汉:武汉大学出版社,2007.(YU Shu-han. Road Engineering[M]. Wuhan:Wuhan University Press,2007.(in Chinese)
[11]李宏波.直线滑动面法分析路基边坡稳定性的探讨[J].路基工程,2010,(6):37-39.(LI Hong-bo. Discussion on Subgrade Slope Stability Using Linear Sliding Surface Method [J]. Subgrade Engineering,2010,(6):37-39.(in Chinese)
[12]胡修文,卢 阳,吁 燃,等. 宜巴高速舒家槽大桥桥基斜坡地质灾害调查和稳定性评价报告[R].武汉:中国地质大学(武汉),2010.(HU Xiu-wen,LU Yang,YU Ran,et al. Geological Hazard Survey and Stability Evaluation Report of Shujiacao Grand Bridge in Yiba Highway[R]. Wuhan:China University of Geosciences,2010.(in Chinese)
文章导航

/

〈 〉