三峡电站流量变率对两坝间通航水流影响的三维计算分析

  • 黄明海 ,
  • 李飞 ,
  • 史德亮 ,
  • 邢领航 ,
  • 唐文坚
展开
  • 1.长江科学院 水力学研究所,武汉 430010;
    2.长江水利委员会 a.规划计划局;b.国际合作与科技局,武汉 430010
黄明海(1978-),男,江西湖口人,高级工程师,主要从事计算水力学和环境工程,(电话)027-82829761(电子信箱)HMH_HK@126.com。

收稿日期: 2012-08-14

  修回日期: 2013-07-03

  网络出版日期: 2013-07-03

基金资助

国家自然科学基金资助项目(11202037);中央级公益性科研院所基本科研业务费专项(CKSF2012026SL,CKSF2013024/SL,CKSF2013028/SL);“十二五”国家科技支撑计划课题(2012BAK10B04)

Three Dimensional Computation of the Influence of Flow Variation Caused by Three Gorges Powerplant on the Navigation Condition Between TGD and Gezhouba Dam

  • HUANG Ming-hai ,
  • LI Fei ,
  • SHI De-liang ,
  • XING Ling-hang ,
  • TANG Wen-jian
Expand
  • 1.Hydraulics Department, Yangtze River Scientific Research Institute, Wuhan 430010, China;
    2.Bureau of Planning, Changjiang Water Resources Commission, Wuhan 430010, China;
    3. Bureau of International Cooperation, Changjiang Water Resources Commission, Wuhan 430010, China

Received date: 2012-08-14

  Revised date: 2013-07-03

  Online published: 2013-07-03

摘要

三峡至葛洲坝两坝间航道曲折多变、水流条件复杂,三峡电站在泄洪和日调节时产生的非恒定流,使得两坝间的航行条件更为复杂。通过建立两坝间通航水流三维数学模型,针对电站机组开启过程下泄流量变率产生的非恒定流对两坝间河段通航水流条件的影响,开展了计算分析研究。计算分析了三峡电站机组不同开启时间和不同开启流量情况对典型河段水面比降、表面流速产生的影响及其变化规律。研究结果表明:机组开启时间变化情况下,通航最困难河段水面比降增幅随机组开启时间缩短而加大,但最大表面流速线性增大;机组开启流量变化情况下,水面比降和最大表面流速随下泄流量线性增大。

本文引用格式

黄明海 , 李飞 , 史德亮 , 邢领航 , 唐文坚 . 三峡电站流量变率对两坝间通航水流影响的三维计算分析[J]. 长江科学院院报, 2013 , 30(7) : 48 -52 . DOI: 10.3969/j.issn.1001-5485.2013.07.010

Abstract

The waterway between Three Gorges Dam (TGD) and Gezhouba Dam is tortuous and varied. The unsteady flow caused by the discharge and daily regulation of TGD powerplant complicates the navigation conditions between the two dams. We established a 3-D mathematical model to simulate the unsteady flow caused by the operation of power units. By analyzing the calculation results, we obtained the variation regularity of water surface water gradient and surface water velocity in typical segment between the two dams in the presence of different operation time s and discharges. Results show that with the shortening of the operation time of power units, the increment of surface water gradient in the most hazardous segment intensified, and the maximum surface velocity increased linearly; while with the increase of discharge, the surface water gradient and maximum surface velocity increased linearly.

参考文献

[1] 孙尔雨,朱庆福.三峡电站调峰对两坝间通航的影响和改善措施[J].人民长江,1999,(12):8-9,12.(SUN Er-yu,ZHU Qing-fu. Influence of Peak Modulation of Three Gorges Power Station in on the Navigation Conditions Between the Two Dams and Improvement measures[J]. Yangtze River,1999, (12):8-9, 12.(in Chinese)
[2] 舒荣龙,陈桂馥,杜宗伟.提高三峡-葛洲坝两坝间通航能力试验研究[J].人民长江,2005,(7):31-33,72.(SHU Rong-long, CHEN Gui-fu, DU Zong-wei. Experiment Study to Improve the Ability of Navigable Flow Conditions Between TGD and Gezhouba Dam[J]. Yangtze River,2005, (7): 31-33, 72.(in Chinese)
[3] 陈桂馥,文 岑,赵世强.三峡电站汛期调峰对两坝间河段通航条件影响的研究[J].水运工程,2004,(5):52-55.(CHEN Gui-fu,WEN Cen,ZHAO Shi-qiang. Influence of Peak Modulation of Three Gorges Power Station in Flood Season on the Navigation Conditions of the Reach Between the Two Dams[J]. Port & Waterway Engineering, 2004, (5):52-55.(in Chinese)
[4] 丁道扬,吴时强.三维宽浅河道水流数学模型研究[J].中国工程科学,2010,12(2):32-39.(DING Dao-yang, WU Shi-qiang. Study on Three-Dimensional Numerical Model for Shallow Water Flow[J]. Engineering Science, 2010,12(2):32-39.(in Chinese)
文章导航

/

〈 〉