目前重视工程前期的论证预测,而对工程后续的观测分析较少。以宁波港镇海港区为例,借助翔实的实测资料,通过镇海沿岸潮流、泥沙特性分析,对大规模围涂后宁波港镇海港区的淤积原因进行了深入分析。区分了不同因素对港区淤积贡献的大小,从而合理解释外游山深潭的淤积机理。分析结果表明:周边规模较大的围涂和外游山局部围涂使其矶头效应显著削弱,是造成该深潭持续淤积的主要原因。
At present, much attention is paid to the demonstration and forecasting before project construction, while the follow-up observations and analysis after the construction are less focused. Through analyzing the tidal current and sediment characteristics, we probed into the causes of deposition in Zhenhai harbor after large-scale reclamation based on full and accurate measured data. The contributions of various affecting factors to the deposition were identified, and the mechanism of deposition in the pool of Waiyou mountain was explained. Results indicate that the large-scale reclamation activity in the surrounding areas of the harbor and the local areas of Waiyou mountain, which have remarkably reduced the effect of projecting rock, is the main causes of continuous deposition of the pool.
[1] 陈吉余. 开发浅海滩涂资源,拓展我国的生存空间[J]. 中国工程科学, 2000,2(3):27-31.(CHEN Ji-yu.To Exploiting Lower Tidal Flats for Expending Living Space of China[J].Engineering Science,2000,2(3):27-31.(in Chinese)
[2] 余祈文,李耒武,耿兆铨,等.镇海新泓口围涂工程专题研究报告[R].杭州:浙江省水利河口研究院,2003:40-40.(YU Qi-wen, LI Lai-wu, GEN Zhao-quan.Research Report on Xinhongkou Reclamation of Zhenhai[R].Hangzhou :Zhejiang Institute of Hydraulics and Estuary ,2003.(in Chinese)
[3] 杨干然,李春初,罗章仁. 海岸动力地貌学研究及其在华南港口建设中的应用[M].广州:中山大学出版社,2004.(YANG Gan-ran, LI Chun-chu, LUO Zhang-ren.Research on Coastal Dynamical Geomorphology and the Application in the Construction of South China Port[M].Guangzhou:Sun Yat-sen University Press,2004.(in Chinese)
[4] 韩曾萃,陈森美,伍冬领,等.河口海岸凸体刷坑最大深度及形态[J ]. 海洋工程,2007,25(2):78-84.(HAN Zeng-cui, CHEN Sen-mei ,WU Dong-ling, et al.The Maximum Depth and Morphology for the Convex in Estuaries and along Coasts[J] .The Ocean Engineering,2007,25(2):78-84.(in Chinese)
[5] 李志永,郜会彩, 王瑞锋,等.镇海港区21~23号码头平面布置方案研究[J].浙江水利科技,2012,(2):14-17.(LI Zhi-yong,GAO Hui-cai, WANG Rui-feng, et al.Demonstration on Plane Layout of Zhenhai 21~23# Wharf[J ].Zhejiang Hydrotechnics,2012,(2):14-17.(in Chinese)