穿黄隧洞内衬预应力混凝土强度有限元计算分析

杨帆,曹生荣

长江科学院院报 ›› 2013, Vol. 30 ›› Issue (7) : 101-105.

PDF(1334 KB)
PDF(1334 KB)
长江科学院院报 ›› 2013, Vol. 30 ›› Issue (7) : 101-105. DOI: 10.3969/j.issn.1001-5485.2013.07.020
水工结构与材料

穿黄隧洞内衬预应力混凝土强度有限元计算分析

  • 杨帆,曹生荣
作者信息 +

Finite Element Calculation and Analysis of the Strength of Prestressed Concrete Lining of Yellow-River-Crossing Tunnel

  • YANG Fan, CAO Sheng-rong
Author information +
文章历史 +

摘要

为验证穿黄隧洞内衬预应力混凝土强度,根据穿黄隧洞双层复合衬砌结构的特点与作用模式,在考虑钢绞线与孔道摩擦、锚具变形及钢筋内缩等引起预应力损失的前提下,采用三维非线性有限元模型对内衬预应力混凝土强度进行了分析与验证。通过计算得出有效预应力在钢绞线上的分布情况,以及分别在张拉工况与设计水头工况下内衬混凝土的内外表面环向应力和平均环向应力的分布规律。计算结果表明:张拉过程中的预应力损失较为严重,需要在施工过程中严格控制张拉应力以及其他引起预应力损失的影响因素,以保证张拉后有效预应力满足强度要求;穿黄隧洞内衬混凝土在两种工况下均实现全截面受压,应力分布满足设计要求,可保证穿黄隧洞的长期有效运行;模拟计算结果的应力参数值与1∶1仿真模型试验值吻合良好,变化规律与关键参数均基本一致。

Abstract

The strength of prestressed concrete lining of Yellow-River-crossing tunnel was analyzed and verified by using 3-D non-linear finite element model. According to the features and action mode of the double composite lining structure, the prestress loss caused by the friction between steel strand and duct, the anchorage device deformation and the inward shrink of steel was taken into account. The distribution of effective prestress in prestressed steel strand was obtained. The distribution of hoop stress in the inner and exterior surface of the lining, as well as the average hoop stress respectively under the stretched steel strand condition and the design waterhead condition was also acquired. The calculation results indicate that the loss of prestress is severe when the steel strands are stretched. The tension stress and other factors affecting the loss of prestress should be controlled strictly so that the effective prestress could meet the strength requirement. Under the above two conditions, the whole section of the concrete lining is totally pressed and its stress distribution is also feasible enough to assure the tunnel’s long-term running. The basic variation and key parameters such as the stress parameters of the numerical calculation results are consistent with those of the full-scaled simulation model test.

关键词

穿黄隧洞 / 预应力衬砌 / 三维非线性有限元 / 强度分析

Key words

Yellow-River-Crossing tunnel / prestressed lining / 3-D nonlinear finite element / strength analysis

引用本文

导出引用
杨帆,曹生荣. 穿黄隧洞内衬预应力混凝土强度有限元计算分析[J]. 长江科学院院报. 2013, 30(7): 101-105 https://doi.org/10.3969/j.issn.1001-5485.2013.07.020
YANG Fan, CAO Sheng-rong. Finite Element Calculation and Analysis of the Strength of Prestressed Concrete Lining of Yellow-River-Crossing Tunnel[J]. Journal of Changjiang River Scientific Research Institute. 2013, 30(7): 101-105 https://doi.org/10.3969/j.issn.1001-5485.2013.07.020
中图分类号: TV332   

参考文献

[1] 符志远.压力隧洞衬砌后张预应力计算[J]. 人民长江,2001,32(9):24-26.(FU Zhi-yuan. Post-tensioned Prestressed Computation for Lining Concrete of Pressure Tunnel[J]. Yangtze River,2001,32(9):24-26.(in Chinese)
[2] 刘秀珍.后张预应力隧洞衬砌计算[J].水利水电工程设计,1998,(9):21-22.(LIU Xiu-zhen. Calculation of the Post-tensioned Prestressing Liner of Tunnel[J]. Design of Water Resources & Hydroelectric Engineering,1998,(9):21-22.(in Chinese)
[3] 刘平云,包 华,洪俊青,等.ANSYS的接触分析在钢筋混凝土滑移中的应用[J].南通大学学报(自然科学版),2009,8(2):70-73.(LIU Ping-yun,BAO Hua,HONG Jun-qing,et al. Application of ANSYS-Based Contact Analysis in Reinforced Concrete Sliding[J]. Journal of Nantong University(Natural Science Edition),2009,8(2):70-73.(in Chinese)
[4] 薛建阳,赵鸿铁,杨 勇,等.型钢混凝土柱粘结滑移性能及ANSYS数值模拟方法研究[J].建筑钢结构进展,2006,8(5):8-16.(XUE Jian-yang,ZHAO Hong-tie,YANG Yong,et al. Research on the Bond-Slip Behavior and Numerical Simulation of Steel Reinforced Concrete Columns by ANSYS Program[J]. Progress in Steel Building Structures, 2006,8(5):8-16.(in Chinese)
[5] 张传健,吕国梁,廖仁强.南水北调中线穿黄隧洞结构设计研究[J].人民长江,2009,40(23):85-87.(ZHANG Chuan-jian,LV Guo-liang, LIAO Ren-qiang. Investigation on Structural Design of Midline Tunnel of South-North Water Transfer Project Through Yellow River[J]. Yangtze River,2009,40(23):85-87.(in Chinese)
[6] 姜小兰,吴 浪,孙绍文,等.南水北调穿黄隧洞内衬预应力锚索应力应变试验研究[J].长江科学院院报,2010,27(4):61-64. (JIANG Xiao-lan,WU Lang,SUN Shao-wen,et al. Investigation on Stress-Strain of Prestressed Anchor Cable in Internal Lining of Tunnel of South-North Water Transfer Project Through Yellow River[J]. Journal of Yangtze River Scientific Research Institute, 2010,27(4):61-64.(in Chinese)
[7] 谢小玲,苏海东,陈 琴.穿黄隧洞预应力衬砌结构三维非线性有限元分析[J].人民长江,2008,39(24):6-7.(XIE Xiao-ling, SU Hai-dong,CHEN Qin. 3-D Nonlinear Limited Element Analysis for Prestressed Liner Structure of the Tunnel Passing Through the Yellow River[J]. Yangtze River,2008,39(24):6-7.(in Chinese)
[8] 钮新强,符志远,张传键.穿黄隧洞衬砌1∶1仿真模型试验研究[J].人民长江,2011,42(8):77-86.(NIU Xin-qiang, FU Zhi-yuan,ZHANG Chuan-jian. Full-scaled Simulation Model and Experiment Research on Lining of Tunnel Crossing Yellow River[J]. Yangtze River,2011,42(8):77-86.(in Chinese)

基金

国家自然科学基金(51079107);中央高校基本科研业务费专项资金( 5082022)。


PDF(1334 KB)

Accesses

Citation

Detail

段落导航
相关文章

/