南水北调大型渡槽流量大、跨度大等特点,对渡槽的设计提出了更高的要求。结合南水北调?河渡槽的工程实例,运用三维有限单元法对该渡槽的受力性能进行模拟,同时重点考虑预应力和温度荷载的影响,研究了渡槽槽身各部位控制断面的应力、变形分布规律。计算结果表明:槽身截面设计和预应力筋布置方案合理,应力和位移均在允许范围内,满足抗裂和挠度要求。
Abstract
Large flow and long span of the large-scale aqueduct in South-to-North Water Diversion Project pose higher requirements for the aqueduct design. Taking the Jihe River Aqueduct for example,the structural behavior of the aqueduct was simulated by using 3-D FEM method. In consideration of pre-stress and temperature load,the distribution of stress and deformation in different control sections of the aqueduct body was analyzed. Result indicates that the design of the aqueduct body section and the scheme of pre-stressed reinforcement are reasonable. Stress and displacement are within the allowable range and both meet the requirements of anti-crack and deflection.
关键词
南水北调 /
大型渡槽 /
预应力配筋 /
有限元法 /
热-应力耦合
Key words
south-to-north water diversion project /
large aqueduct /
pre-stress reinforcement /
FEM method /
thermal stress coupling
{{custom_sec.title}}
{{custom_sec.title}}
{{custom_sec.content}}
参考文献
[1] 任德记,张 超,王 刚,等.预应力矩形渡槽温度应力有限元分析[J].中国农村水利水电,2011,(12): 111-113.(REN De-ji,ZHANG Chao,WANG Gang, et al. A Thermal Stress Finite Element Analysis of Pre-stressed Rectangle Aqueduct [J]. China Rural Water and Hydropower,2011,(12): 111-113.(in Chinese))
[2] 朱伯芳.有限单元法原理与应用[M].北京:中国水利水电出版社,2000: 245-350.(ZHU Bo-fang. Theory and Application of Finite Element Method[M]. Beijing: China Water Power Press,2000:245-350.(in Chinese))
[3] 薛风先,胡仁喜,康士廷,等. ANSYS12.0机械与结构有限元分析从入门到精通[M].北京:机械工业出版社,2010: 366-375.(XUE Feng-xian,HU Ren-xi,KANG Shi-ting, et al. Mechanical and Structural Finite Element Analysis for ANSYS 12.0: Initiation to Master[M]. Beijing: China Mechanical Industry Press,2010:366-375.(in Chinese))
[4] 姚 威,黄 平,彭 辉.新疆尼勒克沟预应力矩形渡槽结构静力分析[J].中国农村水利水电,2010,(2): 95-98.(YAO Wei,HUANG Ping,PENG Hui. A Static Analysis of the Pre-stressed Rectangular Groove in Xinjiang Nileka Aqueduct[J]. China Rural Water and Hydropower,2010,(2): 95-98.(in Chinese))
[5] DL/T5057—2009,水工混凝土结构设计规范[S].北京:中国电力出版社,2009.(DL/T5057—2009,Hydraulic Concrete Structure Design Codes[S]. Beijing: China Electric Power Press,2009.(in Chinese))
[6] KITJAPAT P . Nonlinear Finite Element for Reinforced Concrete Slabs[J]. Journal of Structural Engineering,2005,131(4):643-649.
[7] 陈 松,柯敏勇,刘海洋,等.预应力混凝土组合单元的结构多场效应数值分析[J].水利学报,2011,42(5): 616-622.(CHEN Song,KE Min-yong,LIU Hai-yang, et al. Multi-field Numerical Analysis for Pre-stressed Concrete Structure with Combined Finite Element Model [J]. Journal of Hydraulic Engineering,2011,42(5): 616-622.(in Chinese))
[8] 张社荣,祝 青,李 升.大型渡槽数值分析中预应力的模拟方法[J].水力发电学报,2009,28(3):57-61.(ZHANG She-rong,ZHU Qing,LI Sheng. Simulation Methods of Prestress in Numerical Analysis of Large Aqueduct[J]. Journal of Hydroelectric Engineering,2009,28(3): 57-61.(in Chinese))
[9] 圣玉兰,段亚辉.杨家坝渡槽结构应力与变形三维有限元分析[J].水电能源科学,2011,29(7): 89-92.(SHENG Yu-lan,DUAN Ya-hui. Stress and Deformation Analysis for Yangjiaba Aqueduct with Three-dimensional Finite Element Method[J]. Water Resources and Power,2011,29(7): 89-92.(in Chinese))
[10]钟登华,冷 涛,郑 玲.引丹灌区某渡槽数值计算分析及病险处理[J].长江科学院院报,2008,25(6): 58-61.(ZHONG Deng-hua,LENG Tao,ZHENG Ling. Numerical Analysis and Risky Treatment of Some Aqueduct of Danjiangkou Reservoir [J]. Journal of Yangtze River Scientific Research Institute,2008,25(6): 58-61.(in Chinese))