长江科学院院报 ›› 2014, Vol. 31 ›› Issue (1): 98-102.

• 地下水封石洞油库工程建设研究专栏 • 上一篇    下一篇

首座大型水封石洞油库工程建设管理集成创新模式

陆宝麒1,梁建毅1,张文辉2,赵晓2,陈彦生3   

  1. 1.黄岛国家石油储备基地有限责任公司,山东青岛266510;
    2.武警水电三峡工程指挥部,武汉430223;
    3.长江科学院水利部岩土力学与工程重点实验室,武汉430010
  • 收稿日期:2013-09-11 修回日期:2014-01-06 出版日期:2014-01-01 发布日期:2014-01-06
  • 通讯作者: 赵晓(1976-),男,陕西勉县人,高级工程师,主要从事土木工程建设方面的工作,(电话)18663984007(电子信箱)zhaox2013@foxmail.com。DOI:10.3969/j.issn.1001-5485.2014.01.0202014,31(01):98-102
  • 作者简介:陆宝麒(1944-),男,上海市人,教授级高级工程师,主要从事石油化工建设方面的工作,(电话)0532-83160768(电子信箱)bq_lu2013@163.com。

Integrated Innovations for Construction Management of China’s First Large Underground Water-sealed Oil Storage Cavern

LU Bao-qi1,LIANG Jian-yi1,ZHANG Wen-hui2,ZHAO Xiao2,CHEN Yan-sheng3   

  1. 1.National Petroleum Reserve Huangdao Base Co.Ltd.,Qingdao 266510,China;
    2.TGP Construction Headquarters of the Armed Police Hydropower Troops,Wuhan 430223,China;
    3.Key Laboratory of Geotechnical Mechanics and Engineering of MWR,Yangtze River Scientific Research Institute,Wuhan 430010,China
  • Received:2013-09-11 Revised:2014-01-06 Published:2014-01-01 Online:2014-01-06

摘要: 针对我国首座大型地下水封石洞油库(简称“地下水封洞库”)工程建设特点,采用集成创新、“E+P+C+监理”和第3方技术监测的模式,构建了HD工程建设技术集成、知识集成和组织集成的分析框架,并给出建设管理集成创新评价系统应用表。2 a多的HD工程实践表明该建设管理集成创新模式获得了优良效果,具有如下优点:集“工程建设业主、勘察、设计、施工、监理和监测”六位于一体;“业主、监理和施工”的3层次管理集成创新;在工程建设中可实施“HSE控制、质量控制、进度控制、投资控制和合同控制”5大刚性控制。

关键词: 石油储备, 管理集成创新, 大型洞库, 地下水封

Abstract: HD underground water-sealed cavern is China’s first large underground water-sealed oil storage cavern. In consideration of its construction characteristics,a construction mode involving integrated innovation,E(Engineering)+P(Procurement)+C(Construction)+Supervisor,and technical monitoring by a third-party is proposed. The framework of technology integration,knowledge integration,and organization integration is established,and the assessment system for integrated innovation is given. For the construction management of HD project,the proprietor,investigation,designing,construction,supervision and monitoring are integrated; the integrated innovation is further decomposed into three levels proprietor,supervision and construction; and the HSE control,quality control,schedule control,investment control,as well as contract control are implemented rigidly. Two years of practice at HD project shows that the implementation of integrated innovation has achieved excellent result.

Key words: oil reserve, integrated innovation for management, large cavern, groundwater sealed