某过江隧道南线工程降水方案研究

吴锐,刘文远,王耀忠,吴曼,沈飞军

长江科学院院报 ›› 2013, Vol. 30 ›› Issue (10) : 77-80.

PDF(1381 KB)
PDF(1381 KB)
长江科学院院报 ›› 2013, Vol. 30 ›› Issue (10) : 77-80.
岩土工程

某过江隧道南线工程降水方案研究

  • 吴锐1,刘文远1,王耀忠2,吴曼3,沈飞军2
作者信息 +

Research on Dewatering Scheme for the South Route Project of a River-crossing Tunnel

  • WU Rui1, LIU Wen-yuan1, WANG Yao-zhong2, WU Man3, SHEN Fei-jun2
Author information +
文章历史 +

摘要

以纬三路过江通道南岸工程为背景, 结合场区工程地质及水文地质条件,借鉴该地区类似工程经验,确定基坑降水的影响半径及场区综合渗透系数参考值,在此基础上进行深基坑的降水计算与设计, 详细介绍了疏干井和降压井在基坑降水中的应用。最后,建立地下水渗流数值模型,采用三维有限差分法对基坑内承压含水层降水效果进行模拟验证。模拟结果表明:该降水方案合理可行,达到了设计要求,能够取得明显的效果。实践表明降水方案合理可行,可为该地区其他类似基坑降水工程提供指导。

Abstract

This research is carried out with the tunnel across Yangtze river in the south-bank at Weisan road in Nanjing as the background. In the light of the engineering geological and hydrogeological conditions in the site area, and with reference to experiences in similar projects in Nanjing, the radius of area affected by the dewatering and the comprehensive permeability coefficient of the site area were determined. On this basis, the calculation and design of dewatering for the foundation pit were carried out, and the applications of dewatering wells and buck wells in foundation pit dewatering were introduced. Furthermore, a numerical model of groundwater seepage was established to simulate and validate the dewatering effect for confined aquifer in the foundation pit by using 3-D finite difference method. The simulation results and practice both show that the dewatering scheme is reasonable and feasible.

关键词

深基坑 / 承压含水层 / 降水效果 / 设计 / 地下水渗流数值模型 / 三维有限差分法

Key words

deep foundation pit / confined aquifer / dewatering effect / design / numerical model of groundwater seepage / 3-D finite difference method

引用本文

导出引用
吴锐,刘文远,王耀忠,吴曼,沈飞军. 某过江隧道南线工程降水方案研究[J]. 长江科学院院报. 2013, 30(10): 77-80
WU Rui, LIU Wen-yuan, WANG Yao-zhong, WU Man, SHEN Fei-jun. Research on Dewatering Scheme for the South Route Project of a River-crossing Tunnel[J]. Journal of Changjiang River Scientific Research Institute. 2013, 30(10): 77-80
中图分类号: TU463   

参考文献

[1] 骆祖江,张 弘,李会中,等.乌东德水电站坝址区地下水渗流三维非稳定流数值模拟[J]. 岩石力学与工程学报,2011, 22(2): 341-347.(LUO Zu-jiang, ZHANG Hong, LI Hui-zhong, et al. Three-dimensional Transient Flow Numerical Simulation of Groundwater Seepage in Dam Site of Wudongde Hydropower Station[J]. Chinese Journal of Rock Mechanics and Engineering, 2011, 22(2): 341-347.(in Chinese)
[2] 樊秀峰,吴振祥,钱 会,等. 西安市黑河水库左坝肩渗漏与防渗三维数值模拟研究[J]. 福州大学学报(自然科学版),2002,30(2):235-239.(FAN Xiu-feng, WU Zhen-xiang, QIAN Hui, et al. Three-dimensional Numerical Simulation of Leakage and Leak-proof in Left Dam Abutment of Heihe Reservoir[J]. Journal of Fuzhou University(Natural Science),2002,30(2):235-239.(in Chinese)

PDF(1381 KB)

Accesses

Citation

Detail

段落导航
相关文章

/