葛洲坝大江电厂排沙孔进水口底槛磨损成因分析

刘敦煌,江耀祖,金 峰

长江科学院院报 ›› 2010, Vol. 27 ›› Issue (6) : 23-25.

PDF(825 KB)
PDF(825 KB)
长江科学院院报 ›› 2010, Vol. 27 ›› Issue (6) : 23-25.
水力学

葛洲坝大江电厂排沙孔进水口底槛磨损成因分析

  • 刘敦煌,江耀祖,金 峰
作者信息 +

Analysis of Abrasion Causes at Inlet Bottom Sill of Desilting Outlet for Gezhouba Power Plant

  • LIU Dun-huang , JIANG Yao-zu , JIN Feng
Author information +
文章历史 +

摘要

针对葛洲坝大江电厂排沙孔进水口检修门槽底槛磨损问题,采用水下摄像方法,记录了发电运行时机组进水口流态和排沙孔进水口门砾石运动轨迹。根据观测得到水流特性以及砾石运动规律,分析了底槛磨损影响因素,提出了避免磨损的基本措施。

Abstract

 Aiming at the problem of the abrasion at the bottom sill of emergency gate of desilting outlet of Gezhouba Power Plant, we recorded the flow state of the generator set inlet and the movement of sediment and gravels in the sediment-flushing inlet while the generator sets were running by the underwater photography. By observation, the character of the flow and the law of the sediment movement were gotten, the influencing factors of the abrasion at the bottom sill were analyzed, and some basic measures for avoiding abrasion were given.

关键词

葛洲坝 / 排沙孔 / 磨损 / 成因分析 / 避免磨损措施

Key words

 Gezhouba Power Plant  / the sediment-flushing outlet  / abrasion  / cause analysis  / measures for avoiding abrasion

引用本文

导出引用
刘敦煌,江耀祖,金 峰. 葛洲坝大江电厂排沙孔进水口底槛磨损成因分析[J]. 长江科学院院报. 2010, 27(6): 23-25
LIU Dun-huang , JIANG Yao-zu , JIN Feng. Analysis of Abrasion Causes at Inlet Bottom Sill of Desilting Outlet for Gezhouba Power Plant[J]. Journal of Changjiang River Scientific Research Institute. 2010, 27(6): 23-25
中图分类号: TV698.1   