梅山连拱坝3#垛和12#垛侧向位移过大的成因分析

李雪红, 顾冲时, 周晓贤

长江科学院院报 ›› 2002, Vol. 19 ›› Issue (3) : 25-28.

PDF(351 KB)
PDF(351 KB)
长江科学院院报 ›› 2002, Vol. 19 ›› Issue (3) : 25-28.
材料结构

梅山连拱坝3#垛和12#垛侧向位移过大的成因分析

  •  李雪红, 顾冲时, 周晓贤
作者信息 +

Cause analysis on oversize of lateral displacement of buttresses No.3 and No.12 in Meishan multiple arch dam

  •  LI  Xue-Hong, GU  Chong-Shi, ZHOU  Xiao-Xian
Author information +
文章历史 +

摘要

针对梅山连拱坝3#垛和12#垛侧向位移过大的现象,根据原型观测资料,应用时空分析、数值模型、结构计算等多种方法,并从地形条件及坝体结构等多个角度进行综合分析,认为温度荷载、地形及坝体结构相互间的综合作用是导致3#垛和12#垛侧向位移过大的原因。
Abstract:

Abstract

Aiming at the over-size of lateral displacement of buttress No.3 and buttress No.12 in Meishan multiple arch dam, on the basis of observation data, the methods such as time-space analysis, numerical model, and structural calculation were applied to analyze the cause quantitatively from the topography and the structure of dam body.It can be concluded that the over-size of lateral displacement of buttress No.3 and buttress No.12 is the results of interaction of temperature load, the topography and the structure of dam body.

引用本文

导出引用
李雪红, 顾冲时, 周晓贤. 梅山连拱坝3#垛和12#垛侧向位移过大的成因分析[J]. 长江科学院院报. 2002, 19(3): 25-28
LI Xue-Hong, GU Chong-Shi, ZHOU Xiao-Xian. Cause analysis on oversize of lateral displacement of buttresses No.3 and No.12 in Meishan multiple arch dam[J]. Journal of Changjiang River Scientific Research Institute. 2002, 19(3): 25-28

PDF(351 KB)

Accesses

Citation

Detail

段落导航
相关文章

/