长江科学院院报 ›› 2002, Vol. 19 ›› Issue (3): 25-28.

• 材料结构 • 上一篇    下一篇

梅山连拱坝3#垛和12#垛侧向位移过大的成因分析

 李雪红, 顾冲时, 周晓贤   

  • 出版日期:2002-06-01 发布日期:2012-03-05

Cause analysis on oversize of lateral displacement of buttresses No.3 and No.12 in Meishan multiple arch dam

 LI  Xue-Hong, GU  Chong-Shi, ZHOU  Xiao-Xian   

  • Online:2002-06-01 Published:2012-03-05

摘要: 针对梅山连拱坝3#垛和12#垛侧向位移过大的现象,根据原型观测资料,应用时空分析、数值模型、结构计算等多种方法,并从地形条件及坝体结构等多个角度进行综合分析,认为温度荷载、地形及坝体结构相互间的综合作用是导致3#垛和12#垛侧向位移过大的原因。
Abstract:

Abstract: Aiming at the over-size of lateral displacement of buttress No.3 and buttress No.12 in Meishan multiple arch dam, on the basis of observation data, the methods such as time-space analysis, numerical model, and structural calculation were applied to analyze the cause quantitatively from the topography and the structure of dam body.It can be concluded that the over-size of lateral displacement of buttress No.3 and buttress No.12 is the results of interaction of temperature load, the topography and the structure of dam body.