三峡工程二期临时船闸引航道泥沙淤积研究

胡向阳,姚仕明

长江科学院院报 ›› 2001, Vol. 18 ›› Issue (6) : 7-10.

PDF(177 KB)
PDF(177 KB)
长江科学院院报 ›› 2001, Vol. 18 ›› Issue (6) : 7-10.
河流泥沙

三峡工程二期临时船闸引航道泥沙淤积研究

  • 胡向阳,姚仕明
作者信息 +

Study on sediment accumulation of temporarylock approach channel of TGP

  • HU Xiangyang,YAO shiming
Author information +
文章历史 +

摘要

自1997年大江截流后,临时船闸运行经历了1998丰水丰沙年和1999丰水少沙年。通过原型观测和实船试航,搜集了系统的引航道泥沙淤积和流速、流态资料。实体模型试验成果与资料对比分析表明,实体模型关于引航道的试验成果基本合理,有些预测值与原型接近,为永久通航建筑物设计和运行提供了重要数据。

Abstract

Since the river closure of main channel of the Three Gorges Project (TGP)in 1997, the temporary lock has been operating smoothly, and it has experienced hydrologic year with abundance of water and sediment in 1998 and year with abundance of water but low sediment in 1999. Through the field observations and real ship tests, the data were collected about sediment accumulation, velocity and pattern of flow in the approach channel. Comparison between prototype observed data and model test results shows that the latter are basically reasonable, and some predicated values approximate to the former. These results have provided important basis for the design and operation of permanent navigation structures.

关键词

施工期 / 碍航淤积量 / 原型 / 实体模型

Key words

construction period / sediment accumulation of obstruction navigation / prototype;physical model

引用本文

导出引用
胡向阳,姚仕明. 三峡工程二期临时船闸引航道泥沙淤积研究[J]. 长江科学院院报. 2001, 18(6): 7-10
HU Xiangyang,YAO shiming. Study on sediment accumulation of temporarylock approach channel of TGP[J]. Journal of Changjiang River Scientific Research Institute. 2001, 18(6): 7-10
中图分类号: TV146   

PDF(177 KB)

Accesses

Citation

Detail

段落导航
相关文章

/