天生桥混凝土面板堆石坝变形监测新方法

许仲生

长江科学院院报 ›› 2000, Vol. 17 ›› Issue (5) : 52-54.

PDF(113 KB)
PDF(113 KB)
长江科学院院报 ›› 2000, Vol. 17 ›› Issue (5) : 52-54.
科技简报

天生桥混凝土面板堆石坝变形监测新方法

  •  许仲生
作者信息 +

New instrument and new research task on deformation moni toring of concrete face rockfill dam of Tianshengqiao Power Station

  •  XU  Zhong-Sheng
Author information +
文章历史 +

摘要

介绍了天生桥砼面板堆石坝采用的两项新的监测方 法--脱空观测和坝体内裂缝观测及其新型面板挠度观测仪器--倾斜仪。
Abstract: A new type deflectometer-inclinator used in Tianshe ngqiao Hydroelectric Power Station's concrete rockfillfaced dam and two new research tasks-the observations of cavityformed underneath faceplate of dam and that of fractures in dam body are introduced.

Abstract

A new type deflectometer-inclinator used in Tianshe ngqiao Hydroelectric Power Station's concrete rockfillfaced dam and two new research tasks-the observations of cavityformed underneath faceplate of dam and that of fractures in dam body are introduced. 

引用本文

导出引用
许仲生. 天生桥混凝土面板堆石坝变形监测新方法[J]. 长江科学院院报. 2000, 17(5): 52-54
XU Zhong-Sheng. New instrument and new research task on deformation moni toring of concrete face rockfill dam of Tianshengqiao Power Station[J]. Journal of Changjiang River Scientific Research Institute. 2000, 17(5): 52-54

PDF(113 KB)

Accesses

Citation

Detail

段落导航
相关文章

/