null

徐平, 陈代华

长江科学院院报 ›› 1999, Vol. 16 ›› Issue (1) : 48-51.

PDF(147 KB)
PDF(147 KB)
长江科学院院报 ›› 1999, Vol. 16 ›› Issue (1) : 48-51.
水布垭专辑

null

  •  徐平, 陈代华
作者信息 +

Three Dimensional ElastoPlastic Analysis on Stability of Surrounding Rock of Shuibuya Project's Underground Plant

  •  XU  Ping, CHEN  Dai-Hua
Author information +
文章历史 +

摘要

选取水布垭枢纽中部厂房设计方案的地下厂房区域,采用三维弹塑性有限元法,模拟施工开挖过程,研究了复杂地质条件下洞室群围岩的开挖变形形态与应力状态,分析了围岩塑性区分布及地下厂房洞室群围岩的稳定性,最后提出了设计与施工建议。

Abstract

In this paper, the construction and excavation process of underground plant of the Shuibuya Project are simulated by 3D elastoplastic FEM. The excavating deformation pattern and stress state of the chamber group surrounding rock under complex geological conditions are researched .The distribution of plastic areas and stability of surrounding rock is analysed. Finally some suggestions for design and construction are given.

关键词

水布垭枢纽 / 地下厂房 / 三维弹塑性 / 有限元分析 / 围岩稳定

引用本文

导出引用
徐平, 陈代华. null[J]. 长江科学院院报. 1999, 16(1): 48-51
XU Ping, CHEN Dai-Hua. Three Dimensional ElastoPlastic Analysis on Stability of Surrounding Rock of Shuibuya Project's Underground Plant[J]. Journal of Changjiang River Scientific Research Institute. 1999, 16(1): 48-51

PDF(147 KB)

Accesses

Citation

Detail

段落导航
相关文章

/