水布垭水利枢纽三维渗流场有限元分析

谢红, 张家发, 吴昌瑜, 张伟

长江科学院院报 ›› 1999, Vol. 16 ›› Issue (1) : 37-41.

PDF(163 KB)
PDF(163 KB)
长江科学院院报 ›› 1999, Vol. 16 ›› Issue (1) : 37-41.
水布垭专辑

水布垭水利枢纽三维渗流场有限元分析

  •  谢红, 张家发, 吴昌瑜, 张伟
作者信息 +

Three Dimensional Finite Element Analysis for Seepage Field at Shuibuya Project

  •  XIE  Hong, ZHANG  Jia-Fa, WU  Chang-Yu, ZHANG  Wei
Author information +
文章历史 +

摘要

通过数值模拟分析了心墙堆石坝坝体、坝基和两岸山体的渗流分布规律和防渗帷幕的作用效果,以及坝体、坝基渗透参数变化和不同运行工况等因素对渗流场的影响;结合有关渗透稳定性试验成果,对坝体及坝基的渗流状态作了初步的分析和评价,提出了相应的渗流控制措施。

Abstract

The law of the seepage distributions and the effects of the seepage proof curtain inside the core rock filled dam, foundation and the rock of the hills on both sides of the river, the change of permeability coefficient inside the dam and its foundation and the influence of different working conditions on the seepage field are analyzed by means of finite element numerical simulation. Preliminary analysis and assessment of the seepage status inside the dam and its foundation are made with the reference of seepage stability test results and some suggestions about measures of seepage control are also put forward.

关键词

心墙堆石坝 / 防渗帷幕 / 浸润面 / 地下水位 / 渗流控制

引用本文

导出引用
谢红, 张家发, 吴昌瑜, 张伟. 水布垭水利枢纽三维渗流场有限元分析[J]. 长江科学院院报. 1999, 16(1): 37-41
XIE Hong, ZHANG Jia-Fa, WU Chang-Yu, ZHANG Wei. Three Dimensional Finite Element Analysis for Seepage Field at Shuibuya Project[J]. Journal of Changjiang River Scientific Research Institute. 1999, 16(1): 37-41

基金

null

PDF(163 KB)

Accesses

Citation

Detail

段落导航
相关文章

/