Abstract A brief situation on the Shuibuya Project's high concrcte faced rockfill dam which is the first in the world and the experienees employing research results in the project construction are introduced ,meanwhile,some engineering problems needed to be studied further are presented .
LI Yi-Chang, CAI Jin-Yan.
Application of Scientific Research on Shuibuya Project[J]. Journal of Changjiang River Scientific Research Institute. 1999, 16(1): 1-3