锦屏一级水电站左岸边坡是目前水电工程开挖高度最高、开挖规模最大、稳定条件最差的边坡工程之一,其中由几组构造结构面切割成的变形拉裂体对整个边坡的稳定性尤为重要。介绍了拉裂体施工期监测情况,依据监测资料运用了对比法、因素分析法和特征值统计法等,并结合地质条件和施工信息对拉裂体变形在时间演化规律和空间分布特征等进行了综合分析。综合分析表面、浅部及深部的变形监测资料结果表明经开挖支护后变形拉裂体与边坡整体变形特征总体一致,历经6年多的考验,已趋于稳定。
Abstract
The left bank excavation slope of Jinping first stage hydropower station is remarkable of its height, scale and bad stability condition. The tension-displaced rock mass is comprised of several structural tectonic structural planes and is critical to the stability of the whole excavation slope. The safety monitoring for the tension-displaced rock mass is introduced. Overall analysis on the time evolution and spatial distribution of the tension-displaced rock mass is conducted by using correlation, factors analysis, and eigenvalues statistics according to geological conditions and construction information. The monitoring data of surface, shallow and deep deformation suggest that the tension-displaced mass is consistent with the overall slope deformation characteristics after excavation and support, and after six years of tests, it has gradually stabilized.
关键词
变形拉裂体 /
施工期监测 /
影响因素 /
对比分析 /
变形特征
Key words
tension-displaced rock mass /
monitoring during construction /
influence factors /
comparative analysis /
deformation features
{{custom_sec.title}}
{{custom_sec.title}}
{{custom_sec.content}}
参考文献
[1] 董燕君,邓建华,廖年春,等. 雅砻江锦屏一级水电站左岸边坡安全监测成果分析专题报告.锦屏:锦屏一级水电站安全监测管理中心,2012. (DONG Yan-jun, DENG Jian-hua, LIAO Nian-chun , et al. Monitoring Analysis of Left Bank Slope of Jinping I Hydropower Station. Jinping: Monitoring and Management Center of Jinping I Hydropower Station,2012.(in Chinese))
[2] 黄志鹏,董燕军,廖年春,等. 锦屏一级水电站左岸开挖高边坡变形监测分析 . 岩土力学,2012,33(增刊2):235-242.(HUANG Zhi-peng, DONG Yan-jun, LIAO Nian-chun, et al. Deformation Monitoring and Analysis of Left Bank High Slope at Jinping I Hydropower Station. Rock and Soil Mechanics, 2012, 33(Sup.2):235-242.(in Chinese))
[3] 宋胜武,冯学敏,向柏宇,等.西南水电高陡岩石边坡工程关键技术研究. 岩石力学与工程学报,2011,30(1):1-22.(SONG Sheng-wu, FENG Xue-min, XIANG Bai-yu, et al.Research on Key Technologies for High and Steep Rock Slopes of Hydropower Engineering in Southwest China. Chinese Journal of Rock Mechanics and Engineering, 2011, 30(1):1-22.(in Chinese))
[4] 张金龙,徐卫亚,金海元,等.大型复杂岩质高边坡安全监测与分析. 岩石力学与工程学报,2009,28(9):1819-1827. (ZHANG Jin-long, XU Wei-ya, JIN Hai-yuan, et al. Safety Monitoring and Stability Analysis of Large-scale and Complicated High Rock Slopes. Chinese Journal of Rock Mechanics and Engineering, 2009, 28(9): 1819-1827. (in Chinese))
[5] 杨晓娟,邓建辉,陈 群,等.瀑布沟水电站库首右岸拉裂变形体变形特征与分析. 岩石力学与工程学报,2013,32(3):499-561. (YANG Xiao-juan, DENG Jian-hui, CHEN Qun, et al. Characteristics and Analysis of Deformation of Tension-displaced Rock Mass on Right Bank at Head Area. Chinese Journal of Rock Mechanics and Engineering, 2013, 32(3):499-561.(in Chinese))
[6] 董志宏,丁秀丽,黄志鹏,等.锦屏水电站左岸缆机平台边坡安全监测分析. 人民长江,2007,38(11): 143-145.(DONG Zhi-hong, DING Xiu-li, HUANG Zhi-peng, et al. Safety Monitoring Analysis of Cable Machine Platform Slope for Jinping I Hydropower Station. Yangtze River, 2007, 38(11): 143-145. (in Chinese))
[7] 二滩水电开发有限责任公司.岩土工程安全监测手册.北京:中国水利水电出版社,1999.(Ertan Hydropower Development Company Ltd.. Geotechnical Engineering Safety Monitoring Manual. Beijing:China Water Power Press,1999.(in Chinese))
[8] 黄秋香,汪家林,邓建辉. 基于多点位移计监测成果的坡体变形特征分析. 岩石力学与工程学报,2009,28(增刊1):2667-2673. (HUANG Qiu-xiang, WANG Jia-lin, DENG Jian-hui. Slope Deformation Character Analysis Based on Monitoring Results of Multi-point Borehole Extensometer. Chinese Jorunal of Rock Mechanics and Engineering, 2009, 28(Sup.1): 2667-2673.(in Chinese))