规范中的拱坝结构设计安全度并不完全代表拱坝结构的实际安全度,两者之间存在一定的差异,从而造成业界难以合理认识拱坝安全度的真实水平。结合国内数座已建、在建特高拱坝相关资料,基于多拱梁法,通过拱坝混凝土实际强度这一影响因子的探讨及修正,以及大坝结构最大可能应力的修正,推导出了拱坝结构的实际可能安全度。分析认为,当前规范对应的安全控制标准可以确保拱坝结构实际安全度大于1.0,实际安全裕度是较为合理可靠的。
Abstract
The safety factor of arch dam, which is an important standard of dam safety evaluation, shows a great disparity between design value and actual value. In order to rationally identify the ral safety condition of arch dam, a large number of high arch dam projects are discussed. An estimation formula of the actual possible safety factor of arch dam is derived by correcting the actual strength of concrete and the maximum possible stress of dam structure by using multi-arch beam method. Results demonstrates that the actual safety factor could be guaranteed to be larger than 1.0, which indicates a rational safety margin. The design safety factor could achieve the real security requirements.
关键词
结构安全度 /
真实应力 /
多轴效应 /
特高拱坝
Key words
safety factor /
actual stress /
multiaxial strength of concrete /
arch dam
{{custom_sec.title}}
{{custom_sec.title}}
{{custom_sec.content}}
参考文献
[1] DL/T 5346—2006 , 混凝土拱坝设计规范.北京:中国电力出版社,2007. (DL/T 5346—2006, Design Specification for Concrete Arch Dam. Beijing: China Electric Power Press, 2007. (in Chinese))
[2] SL282—2003, 混凝土拱坝设计规范. 北京:中国水利水电出版社,2003. (SL282—2003, Design Specification for Concrete Arch Dam. Beijing: China Water Power Press, 2003. (in Chinese))
[3] 董福品,朱伯芳,沈之良,等.国内外高拱坝应力分析概况.中国水利水电科学研究院学报,2003,1(4):292-299.(DONG Fu-pin, ZHU Bo-fang, SHEN Zhi-liang, et al. A Survey of High Arch Dam Stresses in the World. Journal of China Institute of Water Resources and Hydropower Research, 2003, 1(4): 292-299. (in Chinese))
[4] 能源部、水利部成都勘测设计研究院.高混凝土坝设计计算方法与设计准则.北京:能源部、水利部成都勘测设计研究院,1990. (Chengdu Engineering Corporation. Calculation Method and Design Rules for High Concrete Dam. Chengdu: Chengdu Engineering Corporation, 1990. (in Chinese))
[5] 杨忠义.全级配混凝土强度的尺寸效应研究.水电站设计,2008,(9):11-14. (YANG Zhong-yi. Study of Effect of Complete Grading Concrete Strength. Design of Hydroelectric Power Station, 2008, (9): 11-14. (in Chinese))
[6] DL/T 5150—2001,水工混凝土试验规程.北京:中国电力出版社,2002. (DL/T 5150—2001, Specification for Tests on Hydraulic Concrete. Beijing: China Electric Power Press, 2002. (in Chinese))
[7] DL/T 5057—2009,水工混凝土结构设计规范.北京:中国电力出版社,2009. (DL/T 5057—2009, Design Standard for Hydraulic Concrete Structure. Beijing: China Electric Power Press, 2009. (in Chinese))
[8] 朱伯芳,高季章,陈祖煜,等. 拱坝设计与研究.北京:中国水利水电出版社,2002. (ZHU Bo-fang, GAO Ji-zhang, CHEN Zu-yu, et al. Design and Research for Concrete Arch Dams. Beijing: China Water Power Press, 2002. (in Chinese))
[9] 李文伟,郑 丹,陈文耀,等,三峡工程大坝混凝土长龄期性能试验研究.水利发电,2009,35(12):76-81. (LI Wen-wei, ZHENG Dan, CHEN Wen-yao, et al. Long Age Performance Test of Dam Concrete of Three Gorges Project. Water Power, 2009,35(12):76-81. (in Chinese))
[10] WASHA G W, SAEMANN J C, CRAMER S M. Fifty-year Properties of Concrete Made in 1937. ACI Materials Journal, 1989, 86(4): 367-371.
[11] 张国新,刘 毅,朱伯芳,等.高拱坝真实工作性态仿真的理论与方法.水力发电学报,2012,31(4):167-174. (ZHANG Guo-xin, LIU Yi, ZHU Bo-fang, et al. Theory and Method on Simulation of Actual Working Performance of High Arch Dams. Journal of Hydroelectric Engineering, 2012,31(4):167-174. (in Chinese))