摘要

传统的PDCA循环方法具有提高产品质量、改善企业运营管理的优点,但也存在着缺乏创造性、缺乏沟通与协作及知识共享、受全面质量管理中“顾客是上帝”思想的局限及缺乏潜在知识挖掘等缺点。基于已有PDCA循环理论,提出了接力链螺旋(Relay Chain Helix,RCH)循环技术,阐述了其运行原理、操作步骤、操作流程及其运行特点。该技术不仅能够解决PDCA循环理论在应用中存在的问题,而且能够提高系统的创造性及提高持续改进的质量与效率。经过在三峡三期工程大坝混凝土施工质量控制中的推行应用,该技术提高了工程质量,使大坝提前9个月全线建成,创造了混凝土大坝无裂缝的施工奇迹。

Abstract

Traditional theory of PDCA (Plan, Do, Check, Action) circulation is an important method of raising product quality and improving enterprise’s operation management, but also has shortcomings such as lack of creativity, lack of communication, collaboration and knowledge sharing, lack of tacit knowledge mining, and limited by the ideology of “customer is God” from total quality management (TQM). On the basis of PDCA circulation theory, we present a technology of relay chain helix (RCH) circulation, and elaborate its operation principles, steps, processes and characteristics. This technology overcomes the problems in the application of PDCA circulation theory, and also improves the system’s creativity, the quality and efficiency of continuous improvement. It was applied to the quality control for concrete construction in the third phase of Three Gorges Project, and has improved the project quality. The project was completed 9 months ahead of schedule, which is a miracle of concrete construction with no crack.

关键词

RCH循环 / PDCA / 持续改进 / 三峡工程

Key words

RCH circulation / PDCA / continuous improvement / Three Gorges Project

引用本文

导出引用
王博,李智勇,黄家权,张俊霞. 接力链螺旋循环技术[J]. 长江科学院院报. 2014, 31(8): 106-111 https://doi.org/10.3969/j.issn.1001-5485.2014.08.0212014,31(08):106-111
WANG Bo, LI Zhi-yong,HUANG Jia-quan, ZHANG Jun-xia. Technology of Relay Chain Helix Circulation[J]. Journal of Changjiang River Scientific Research Institute. 2014, 31(8): 106-111 https://doi.org/10.3969/j.issn.1001-5485.2014.08.0212014,31(08):106-111
中图分类号: TV523   

参考文献

[1] SHEWHART W A. Statistical Method from the Viewpoint of Quality Control[M]. New York:Dover Publications, 1986 :4-5.
[2] LATZKO W J,DAVID M. Saunders, Four days with Dr. Deming: A Strategy for Modern Methods of Management [M]. UK: Addison-Wesley Education Publishers Inc, 1995, (1): 10-23, 60-77.
[3] CHANG J I, LIANG C L. Performance Evaluation of Process Safety Management Systems of Paint Manufacturing Facilities [J]. Journal of Loss Prevention in the Process Industries, 2009, 22(4):398-402.
[4] TYE M J, WHEELER W E. Applying Focus-PDCA Methodology to Improve Patient Meal Service Practices[J]. Journal of the American Dietetic Association,2007, (8): A71.
[5] MICIZ, MICIM, BLAGOJEVI M. ICT Innovations at the Platform of Standardisation for Knowledge Quality in PDCA [J]. Computer Standards & Interfaces, 2013, 36(1):231-243.
[6] ZHANG Q Y, SUN X F, WANG C. The Quality Management of Food Cold Chain Logistics Based on PDCA Cycle[J]. Advanced Materials Research, 2012, (424/425):1338-1341.
[7] 李仲学,曹志国,赵怡晴. 基于Safety case 和PDCA的尾矿库安全保障体系[J]. 系统工程理论与实践,2010, 30(5):936-944.(LI Zhong-xue, CAO Zhi-guo, ZHAO Yi-qing. Safety Case and PDCA Based Safety Assurance System for Mine Tailings Facilities[J]. Systems Engineering-Theory & Practice, 2010, 30(5): 936-944. (in Chinese))
[8] 冯 晨. 基于新PDCA环的精益生产应用研究[D]. 南京:南京理工大学,2007.(FENG Chen. Application Research on Lean Production Based on New PDCA Loop[D]. Nanjing: Nanjing University of Science and Technology, 2007. (in Chinese))
[9] 潘 峰,冯雪萍,刘轶宏. 构建R-PDCA循环推进高职课程改革[J]. 实验技术与管理,2012, 29(10):139-141.(PAN Feng, FENG Xue-ping, LIU Yi-hong. Constructing R-PDCA Circulation to Push on Curriculum Reform in Higher Vocational Colleges[J]. Experimental Technology and Management, 2012, 29(10):139-141. (in Chinese))
[10]刘满芝,周梅华,姚伟坤,等. 三维PDCA循环在兖州煤业质量管理中的创新应用[J]. 中国煤炭,2008, 34(1):61-63.(LIU Man-zhi, ZHOU Mei-hua, YAO Wei-kun, et al. The Innovative Applications of Three-dimensional PDCA Circulation in Yanzhou Coal Quality Management[J]. China Coal, 2008, 34(1):61-63.(in Chinese))
[11]程庆寿. 关于接力工作法的基本构思[J]. 科技进步与对策,1991,8(2):51-52. (CHENG Qing-shou. The Basic Idea about Relay Working Method[J]. Science & Technology Progress, 1991,8(2):51-52. (in Chinese))
[12]程庆寿. 接力技术的基本原理与实践[J].科技进步与对策,1993, 10(1):42-44. (CHENG Qing-shou. The Basic Principles and Practice of Relay Technology[J]. Science & Technology Progress, 1993,10(1):42-44. (in Chinese))
[13]杨学会, 范五一, 李 峰. 三峡三期工程大坝混凝土优质快速施工新技术研究及实践[J]. 水力发电学报, 2009, 28(6):126-130. (YANG Xue-hui, FAN Wu-yi, LI Feng. Research and Practice on New Technology of Concrete Rapid Construction in Three Gorges Project[J]. Journal of Hydroelectric Engineering, 2009, 28(6):126-130. (in Chinese))
[14]三期工程混凝土温控工作小组. 长江三峡水利枢纽右岸大坝与电站厂房工程温控资料汇编[R]. 宜昌:中国长江三峡工程开发总公司, 2005: 22-23, 321-322. (Team of Concrete Temperature Control for the Third Phase of Three Gorges Project. Compilation of Temperature Control Data for the Right Bank of the Dam and Powerhouse in Three Gorges Project[R]. Yichang: China Three Gorges Project Corporation, 2005: 22-23, 321-322. (in Chinese))
[15]三期工程混凝土温控工作小组. 长江三峡水利枢纽三期主体工程混凝土温控总结与资料汇编[R]. 宜昌: 中国长江三峡工程开发总公司, 2007: 154-155. (Team of Concrete Temperature Control for the Third Phase of Three Gorges Project. Summary and Data Compilation of Concrete Temperature Control for the Main Part of the Third Phase of Three Gorges Project[R]. Yichang: China Three Gorges Project Corporation, 2007: 154-155. (in Chinese))

基金

中国葛洲坝集团三峡建设工程有限公司科研资助项目(2013KJ-01)