黄草峡属于中洪水激流滩,位于长寿城区下游约9 km,黄牛岭一侧159~163 m平台对水流影响较大,影响上行船舶的安全航行并缩短了船舶的通航周期。当黄草峡水位超过162 m以后,左岸一侧会产生大范围的滑梁水、急流等碍航流态,束窄航槽,影响船舶通行,尤其是上行通行。通过分析黄草峡河段目前存在的航槽水深和流态问题,为了改善当前的不良通航条件,提出了工程可行性研究和数学模型2种比选方案。并通过二维数学模型对2种方案在该河段实测的水位流量的控制条件下的论证研究,分析数模计算结果,得出2种方案各有优缺点。因此,应根据具体需求选出最佳方案作为推荐整治方案。
Abstract
Huangcao Gorge is located approximately 9km downstream of Changshou District of Chongqing City. Torrent flow and over-ledge current are formed in the lower reach at Huangniu ridge (the left bank) when the water level exceeds 162m. The safe navigation (especially upward navigation) is affected and the navigation cycle is shortened by this flow regime. To improve the navigation condition, we analyzed the water depth and flow pattern in the navigation channel, and proposed two schemes of rock blasting and demonstrated them by establishing 2-D mathematical models (with measured water level and flow as control conditions). By analyzing the computation results, we concluded that both the schemes could meet the requirement, but scheme 1 (simple blasting to the designed elevation) is cost-saving but couldn’t enhance the navigable flow condition much; whereas scheme 2 (by cutting slope and blasting the rock platform at 159-163m) effectively improves the flow condition. Measures should be taken according to specific requirements and budget conditions.
关键词
黄草峡 /
航道整治 /
数学模型 /
方案比选
Key words
Huangcao Gorge /
channel regulation /
mathematical model /
comparison and selection of schemes
{{custom_sec.title}}
{{custom_sec.title}}
{{custom_sec.content}}
参考文献
[1] 胡旭跃.航道整治[M].北京:人民交通出版社,2008. (HU Xu-yue. Waterway Regulation [M]. Beijing: China Communications Press, 2008. (in Chinese))
[2] 长江重庆航运工程勘察设计院,重庆交通大学.三峡工程135m水位和156m水位蓄水运行期库区急流滩险水流条件变化研究[R].重庆:长江重庆航运工程勘察设计院,2010.(Chongqing Harbour and Waterway Engineering Investigation and Design Institute and Chongqing Jiaotong University. Variation of Flow Condition at the Rapid Currents in the Tail Area of Three Gorges Reservoir under 135m and 156m Water Level[R]. Chongqing: Chongqing Harbour and Waterway Engineering Investigation and Design Institute, 2010.(in Chinese))
[3] 长江重庆航运工程勘察设计院.长江上游娄溪沟至涪陵河段炸礁工程可行性研究报告[R]. 重庆:长江重庆航运工程勘察设计院,2011. (Chongqing Harbour and Waterway Engineering Investigation and Design Institute. Feasibility of Rock Blasting from Louxigou to Fuling Reach in the Upstream of Yangtze River[R]. Chongqing: Chongqing Harbour and Waterway Engineering Investigation and Design Institute, 2011. (in Chinese))
[4] JTJ/T 232—98,内河航道与港口水流泥沙模拟技术规范[S].北京:人民交通出版社,1998.(JTJ/T 232—98, Technical Specifications on the Simulation of Flow and Sediment in In-land Navigation Channels and Estuaries[S]. Beijing: China Communications Press, 1998. (in Chinese))
[5] 李 健.河道采砂影响的数值模拟研究[D].武汉:长江科学院,2008.(LI Jian. Numerical Simulation on River Sand Extraction Effect[D]. Wuhan: Yangtze River Scientific Research Institute, 2008. (in Chinese))
[6] 长江航道局. 航道工程手册[M].北京: 人民交通出版社,2004. (Changjiang Waterway Bureau. Waterway Engineering Manual[M]. Beijing: China Communications Press, 2004. (in Chinese))
[7] 姚仕明. 三峡葛洲坝通航水流数值模拟及航运调度系统研究[D].北京:清华大学,2006. (YAO Shi-ming. Numerical Simulation of Navigable Flow Conditions and Development of Shipping Dispatching System for the Three Gorges & Gezhouba Projects[D]. Beijing: Tsinghua University,2006. (in Chinese))
[8] 张 鹏, 胡 江.三峡库区急流滩代表船舶自航上滩水力指标研究[J]. 重庆交通大学学报:自然科学版,2012,(4):877-880.(ZHANG Peng, HU Jiang. Study on the Navigable Hydraulic Parameter of 3000-ton Ships at the Rapids of Three Gorges Reservoir Area[J]. Journal of Chongqing Jiaotong University: Natural Science,2012,(4):877-880. (in Chinese))
基金
国家“十二五”科技支撑计划项目(2012BAB05B03)