基于预报预泄的五强溪水库主汛期运行水位优化
Optimization of Operating Water Level of Wuqiangxi Reservoir in Main Flood Season Based on Forecast and Pre-discharge
汛期调度方式优化是提升五强溪水库综合效益的重要抓手。在确保防洪安全的前提下,基于预报预泄的方法,研究了五强溪水库主汛期运行水位动态控制范围、启动条件和预报预泄调度方式,计算分析了汛期运行水位上浮方案产生的综合效益。以1996年和2019年汛期调度实践为例,实施汛期运行水位动态控制,分别可提高发电水头0.48、0.54 m,减少弃水量8.53亿、9.56亿 m3,增加发电量1.26亿、1.34亿 kW·h。结果表明结合来水预报,在风险可控的条件下动态控制五强溪水库汛期运行水位,可在减少机组出力受阻几率和弃水的同时,显著提高水库的发电效益。
Optimizing the dispatching mode during flood season is a crucial step in enhancing the comprehensive benefits of Wuqiangxi Reservoir. On the premise of ensuring flood control safety, we employed the method of forecast and pre-discharge to investigate the range and starting conditions for dynamic control of water level, and the operation mode of pre-discharge for Wuqiangxi Reservoir during the main flood season. Additionally, we calculated the comprehensive benefits of uplifting operational water level in flood season. Case studies on the flood season operations in 1996 and 2019 demonstrate that dynamic control of operating water level during flood season increased power generation head by 0.48 and 0.54 meters, reduced wasted water by 853 million and 956 million cubic meters, and boosted power generation by 126 million and 134 million kW·h, respectively. The results indicate that under controllable risk conditions, dynamic control of operating water level in Wuqiangxi Reservoir during flood season significantly improves power generation efficiency while reducing the likelihood of unit output blockage and water waste.
运行水位优化 / 动态控制 / 预报预泄 / 主汛期 / 五强溪水库
water level optimization / dynamic control / forecast and pre-discharge / main flood season / Wuqiangxi reservoir
| [1] |
彭才德. 五强溪水库汛期水位动态控制运用研究[J]. 水力发电, 2004, 30(6): 71-74.
(
|
| [2] |
冯佳宁, 李晓英, 张琰, 等. 基于系统协调度模型的汛限水位分期控制[J]. 长江科学院院报, 2024, 41(1):9-17.
(
|
| [3] |
李英海, 夏青青, 王永强, 等. 考虑溪-向梯级调蓄影响的三峡水库分期汛限水位研究[J]. 长江流域资源与环境, 2022, 31(7): 1514-1522.
(
|
| [4] |
余玉聪, 李雯晴, 刘招, 等. 金沙江下游梯级水库汛期分期及汛限水位合理性研究[J]. 长江科学院院报, 2020, 37(9): 39-44.
汛期分期以及分期汛限水位的合理确定,能够较好地协调水库防洪效益与发电效益之间的矛盾,对充分发挥水库的防洪、发电能力,以及提高汛期洪水资源利用率具有重要意义。基于改进的模糊集分析方法并依据金沙江下游乌东德、白鹤滩、溪洛渡、向家坝4个梯级水库入库洪水对其汛期进行分期,通过隶属度与防洪库容的映射关系确定梯级水库分期汛限水位,提出利用跨期选样法对分期结果及汛限水位进行修正。研究结果表明:金沙江下游梯级水库前汛期为6月1日—7月14日,主汛期为7月15日—9月16日,后汛期为9月17日—10月24日,4个梯级水库合理汛限水位分别为962,800,575,374 m。通过不同典型洪水放大的洪水过程检验了分期汛限水位的合理性。研究得到的金沙江下游梯级分期结果及各库分期汛限水位,均能够在满足防洪安全的前提下提高水库发电等经济效益,在一定程度上提高了汛期洪水资源的利用率。
(
Determining flood season stages and corresponding water levels in flood season stages rationally could help coordinate the contradiction between flood control benefit and power generation benefit of reservoirs, and is also of great significance to give full play to flood control and power generation capacity of reservoirs and improve the utilization rate of flood resources in flood season. In this paper, the flood season of cascade reservoirs(Wudongde,Baihetan,Xiluodu,and Xiangjiaba) in the lower reaches of Jinsha River is divided into stages according to the incoming flood using the improved fuzzy set analysis method, and the staged limit water level of cascade reservoirs is determined through the mapping relationship between membership degree and flood control capacity. The stages and corresponding limit flood levels are revised with intertemporal sampling method. Research results reveal that the pre-flood season of cascade reservoirs in the lower reaches of Jinsha River is July 1-July 14, main flood season July 15-September 16, and post-flood season September 17-October 24. The reasonable limit flood level for the four reservoirs is 962 m, 800 m, 575 m and 374 m, respectively. The staged limit flood levels are verified through the flood process of different typical floods. The staging results obtained in this study and the phased limit flood level of each reservoir could improve the economic benefits of reservoirs' power generation under the premise of flood control safety, and enhance the utilization rate of flood resources in flood season.
|
| [5] |
秦智伟, 戴明龙, 陈炼钢, 等. 三峡水库汛期分期洪水特征及成因研究[J]. 人民长江, 2018, 49(22): 1-6.
(
|
| [6] |
伍昕. 五强溪水库汛限水位动态控制效益与应用浅析[J]. 湖南水利水电, 2009(4):18-19.
(
|
| [7] |
郭生练, 刘攀, 王俊, 等. 再论水库汛期水位动态控制的必要性和可行性[J]. 水利学报, 2023, 54(1):1-12.
(
|
| [8] |
荆柱, 朱利明, 巴欢欢, 等. 亭子口水利枢纽汛期运行水位动态控制策略研究[J]. 人民长江, 2022, 53(8):15-22.
(
|
| [9] |
张晓琦, 刘攀, 陈进, 等. 基于两阶段风险分析的水库群汛期运行水位动态控制模型[J]. 工程科学与技术, 2022, 54(5): 141-148.
(
|
| [10] |
周研来, 郭生练, 王俊, 等. 金沙江下游梯级水库汛期运行水位协同浮动调度研究[J]. 水利学报, 2023, 54(6): 633-643.
(
|
| [11] |
雷苏琪, 何中政, 闫峰, 等. 万安水库主汛期运行水位动态控制预泄策略研究[J]. 水电能源科学, 2022, 40(11): 73-76.
(
|
| [12] |
贺伟, 巴欢欢. 五强溪水电站主汛期运行水位动态控制研究[J]. 云南水力发电, 2022, 38(6): 287-291.
(
|
/
| 〈 |
|
〉 |