长江科学院院报 ›› 2022, Vol. 39 ›› Issue (10): 103-108.DOI: 10.11988/ckyyb.20220596

• 岩土工程 • 上一篇    下一篇

内河交汇处沉管隧道基槽回淤厚度研究

傅鹤林1, 董子龙1,2, 洪开荣2, 安鹏涛1, 林锐1   

  1. 1.中南大学 土木工程学院, 长沙 410075;
    2.中国中铁隧道局集团有限公司,广州 510000
  • 收稿日期:2021-06-13 修回日期:2021-09-07 发布日期:2022-10-13
  • 作者简介:傅鹤林(1965-),男,江西高安人,教授,博士,博士生导师,主要从事岩石力学及隧道工程等方面的教学与研究工作。E-mail:fu.h.l@csu.edu.cn
  • 基金资助:
    国家自然科学基金项目(51978668);中铁隧道科研项目(20190603)

Silt Characteristics of Immersed Tube Tunnel Foundation Trench at Inland River Intersection

FU He-lin1, DONG Zi-long1,2, HONG Kai-rong2, AN Peng-tao1, LIN Rui1   

  1. 1. School of Civil Engineering,Central South University,Changsha 410075,China;
    2. China Railway Tunnel Bureau,Guangzhou 510000,China
  • Received:2021-06-13 Revised:2021-09-07 Online:2022-10-13

摘要: 基槽回淤对沉管隧道平顺度影响较大,对其防水性能产生威胁。为研究两河交汇处沉管隧道基槽的回淤特性,依托如意坊沉管隧道,构建数值计算模型,对比实际监测值以验证模型的适用性,进而揭示内河交汇处沉管隧道基槽回淤规律。研究结果表明:模型中河流流速与实际监测数据误差较小,验证了模型的适用性;内河交汇处基槽淤积厚度整体呈中间大两端小、上游大下游小的规律;回淤分布受空间影响较大,基槽底脚淤积显著,且坡顶淤积厚度显著小于坡底;回淤量随时间的延长其敏感性逐渐下降;基槽开挖后,回淤均值为10 cm,将影响沉管隧道的施作,现场须采取清淤措施进行处置。研究成果为两河交汇处沉管隧道基槽回淤分析与治理提供了指导。

关键词: 内河交汇处, 沉管隧道, 基槽回淤, 数值模拟, 回淤规律

Abstract: The siltation of foundation trench has severe impact on the smoothness of immersed tube tunnel and threatens its waterproof performance.The silt characteristics of immersed tunnel foundation trench at the intersection of two rivers are researched by establishing a numerical calculation model.The simulation result is compared with actual monitoring value to verify the applicability of the model,and furthermore to reveal the siltation characteristics of immersed tunnel foundation trench at inland river intersection.Results display small error between the simulated flow velocity and the actual monitored value,verifying that the model is applicable.The silt depth is large in the middle and small in two ends,and large in the upstream while small in the downstream.The siltation varies largely in space,distributing apparently at the trench foot and remarkably on slope crest than at slope toe.The sensitivity of siltation attenuates gradually over time.After the excavation of foundation trench,the silt depth reached 10 cm,which would affect the application of the immersed tunnel.Dredging measures on site are required.

Key words: intersection of inland rivers, immersed tunnel, back-silting of foundation trench, numerical simulation, law of back-silting

中图分类号: