长江科学院院报 ›› 2020, Vol. 37 ›› Issue (12): 169-175.DOI: 10.11988/ckyyb.20200731

• 信息技术与应用 • 上一篇    下一篇

杨房沟水电站建设质量智慧管理系统的研发及应用

鄢江平, 翟海峰   

  1. 雅砻江流域水电开发有限公司,成都 610051
  • 收稿日期:2020-07-22 修回日期:2020-09-25 出版日期:2020-12-01 发布日期:2020-12-28
  • 作者简介:鄢江平(1972-),男,湖北石首人,教授级高级工程师,主要从事水利工程管理工作。E-mail:yanjiangping@ylhdc.com.cn

Development and Application of an Intelligent Management System for Construction Quality of Yangfanggou Hydropower Station

YAN Jiang-ping, ZHAI Hai-feng   

  1. Yalong River Hydropower Development Co., Ltd., Chengdu 610051, China
  • Received:2020-07-22 Revised:2020-09-25 Online:2020-12-01 Published:2020-12-28

摘要: 为提高工程管理效率、控制工程质量、减少人为因素对工程质量的影响,利用信息化、数字化、自动控制等技术对施工过程中的信息、混凝土温度、混凝土振捣、灌浆等环节进行智能监控和管理。为此,杨房沟水电站依托设计施工BIM管理系统的质量管理功能模块,以及由BIM系统集成的智能温控、智能振捣、智能灌浆、全过程影像采集系统,研发形成了大坝智能建造环境下的质量智慧管理系统。通过实现施工质量信息“实时采集-实时分析-决策反馈”的动态质量管理,解决了EPC建设模式以及传统大坝质量管理存在的施工质量控制、信息收集、分析、决策等方面的问题,提高了管理效率和管理质量,取得了较好的管理成效。

关键词: 水电站建设, 质量智慧管理系统, EPC, 大坝智能建造, BIM管理系统, 杨房沟水电站

Abstract: In the aim of improving project management efficiency, controlling project quality, and reducing the impact of human factors on project quality, the construction information, concrete temperature, concrete vibrating, and grouting in the construction process are intelligently monitored and controlled via information technology, digitalization, automatic control and other technologies. In view of this, an intelligent management system for construction quality under the intelligent construction environment for Yangfanggou Hydropower Station is developed based on the quality management modules of the BIM management system as well as the intelligent temperature control, intelligent vibrating, intelligent grouting, and whole-process image acquisition system integrated by the BIM management system. The construction quality information is managed dynamically through real-time collection, real-time analysis, and decision feedback. The problems in construction quality control, information collection, analysis, and decision-making in the EPC and traditional construction mode have been solved. The present intelligent system has improved management efficiency and management quality, and achieved better management results.

Key words: hydropower station construction, intelligent management system for construction quality, EPC, intelligent dam construction, BIM management system, Yangfanggou Hydropower Station

中图分类号: