长江科学院院报 ›› 2020, Vol. 37 ›› Issue (11): 64-69.DOI: 10.11988/ckyyb.20200244

• 工程安全与灾害防治 • 上一篇    下一篇

超前半闭合双导洞台阶法在富水大断面隧道中的应用

朱佳华1, 原华1,2, 李吉杨芙3, 陈文4   

  1. 1.河南大学 土木建筑学院,河南 开封 475004;
    2.河南大学 岩土与轨道交通工程研究所,河南 开封 475004;
    3.万宝矿产有限公司,北京 100083;
    4.玉溪市晋红高速公路投资发展有限公司,云南 玉溪 653100
  • 收稿日期:2020-03-23 修回日期:2020-06-12 出版日期:2020-11-01 发布日期:2020-12-02
  • 通讯作者: 原 华(1982-),女,河南温县人,副教授,博士,主要从事地下结构方面的研究。E-mail: yuanhuazzl@163.com
  • 作者简介:朱佳华(1992-),男,江西定南人,硕士研究生,主要从事地下工程方面的研究。E-mail: 274428504@qq.com
  • 基金资助:
    国家自然科学基金项目(51608174);河南省重点研发与推广专项(科技攻关)项目(202102310247)

Application of Advanced Semi-closed Double Pilot Step Method in Water-rich Tunnel with Large Section

ZHU Jia-hua1, YUAN Hua1,2, LI Ji-yang-fu3, CHEN Wen4   

  1. 1. School of Civil Engineering and Architecture, Henan University, Kaifeng 475004, China;
    2. Institute of Geotechnical and Rail Transport Engineering, Henan University, Kaifeng 475004,China;
    3. Wanbao Mining Co., Ltd., Beijing 100083, China;
    4. Yuxi Jinhong ExpresswayInvestment and Development Co., Ltd., Yuxi 653100, China
  • Received:2020-03-23 Revised:2020-06-12 Published:2020-11-01 Online:2020-12-02

摘要: 为解决用传统工法在富水大断面隧道不良地质段施工时出现的涌水、塌方等灾害,以云南省光山1号隧道为工程背景,通过工程地质调查和涌水、塌方机制分析,提出“超前半闭合双导洞台阶法”(简称“ASDP台阶法”)。用有限差分软件FLAC3D对新工法的施工过程进行数值模拟。结合现场监测数据,发现右、左导洞开挖对拱顶、拱底竖向变形的“贡献”甚微,即使该工法提前开挖了导洞仰拱,但通过迅速施作工字钢形成半闭合结构,能够很好地控制土体卸荷带来的拱底隆起和隧道整体变形。采用ASDP台阶法后,光山1号隧道不良地质段最终得以顺利完成。ASDP台阶法工序衔接合理,进尺效率高,排水效果良好,造价低,可作为不良地质下富水大断面隧道施工的首选工法。

关键词: 公路隧道, 超前半闭合双导洞台阶法, 富水, 大断面, 突涌水

Abstract: To tackle the problems of water inrush, collapse and other disasters in the construction of the unfavorable geological segment of water-rich large-sectional tunnel using traditional construction methods, we propose an advanced semi-closed double pilot step method (ASDP step method for short) based on engineering geological investigation and analysis on water inrush and collapse mechanism. Subsequently, we simulate the construction process of ASDP step method by using finite difference software FLAC3D. In association with field monitoring data, we found that the excavation of the right and left pilots contributes little to the vertical deformation of the arch crown and the arch bottom. Even if the inverted arch of pilot is excavated in advance in this method, the arch bottom uplift and overall tunnel deformation caused by soil unloading can be well controlled by quickly applying I-beam to form a semi-closed structure. After adopting ASDP step method, we successfully completed the construction of unfavorable geological segment of Guangshan No.1 Tunnel. The ASDP step method is featured with reasonable connection among procedures, high footage efficiency, good drainage effect and low cost, thus can be used as the preferred method for the construction of water-rich large-sectional tunnel in unfavorable geology.

Key words: highway tunnel, advanced semi-closed double pilot step method, water-rich, large-section, water inrush

中图分类号: