蓄水期大岗山右岸抗剪洞加固及其效果分析

刘兴宗, 唐春安, 孙润

长江科学院院报 ›› 2019, Vol. 36 ›› Issue (11) : 104-109.

PDF(2084 KB)
PDF(2084 KB)
长江科学院院报 ›› 2019, Vol. 36 ›› Issue (11) : 104-109. DOI: 10.11988/ckyyb.20180288
岩土工程

蓄水期大岗山右岸抗剪洞加固及其效果分析

  • 刘兴宗1,2,3, 唐春安1, 孙润4
作者信息 +

Reinforcement Mechanism and Effectiveness of Anti-shear Galleries in the Right Bank of Dagangshan Hydropower Station in the Process of Reservoir Impoundment

  • LIU Xing-zong1,2,3, TANG Chun-an1, SUN Run4
Author information +
文章历史 +

摘要

为研究蓄水期大岗山水电站右岸边坡抗剪洞的加固机理和加固效果,首先根据微震监测结果分析了蓄水过程中抗剪洞及周围岩体的微震活动性,圈定了蓄水期右岸边坡内部主要损伤区域;然后利用真实破裂过程分析方法(RFPA)模拟蓄水过程,得到了蓄水过程中边坡的应力场、位移场,对抗剪洞在蓄水过程中的微震活动性作出解释;最后,利用数值模拟方法分析了蓄水过程中抗剪洞的加固作用机理,评价了抗剪洞加固措施在蓄水过程中的加固效果。研究表明:抗剪洞能够提高边坡的抗剪能力,但随着其布设的高程降低,这种加固效果越来越弱;蓄水过程中,抗剪洞表现出了宏观剪切、微观拉裂的破坏形式。

Abstract

The mechanism and effectiveness of reinforcing the right bank slope of Dagangshan hydropower station by replacing weak zones with anti-shear galleries during water storage are investigated. According to microseismic monitoring, the major damage regions in the right bank slope are identified; microseismic activities concentrates in the vicinity of anti-shear galleries at 1 240 m, 1 210 m, 1 180 m, and 1 150 m, mainly induced by tention fractures. Moreover, the stress field and displacement field during impounding are obtained by numerical simulation in RFPA (realistic failure process analysis) code to explain the microseismic activities of anti-shear galleries: stress concentration and failure are prone to occur around the anti-shear galleries which is in tension state. In association with the numerical results together with the microseismic-monitoring data, macro-shear and micro-tension are found to be the failure mode of anti-shear galleries. In the early stage of impounding, anti-shear gallery affects the stress distribution in the bank slope, and refrains from penetrative plane of fracture. Meanwhile, anti-shear gallery could enhance the anti-shear ability of bank slope; however such effect attenuates with the decline of elevation. In general, anti-shear galleries are conducive to the stability of bank slope during impoundment.

关键词

抗剪洞 / 加固效果 / 微震监测 / 数值模拟 / 蓄水 / 大岗山水电站

Key words

anti-shear gallery / reinforcement effect / microseismic monitoring / numerical simulation / impoundment / Dagangshan hydropower station

引用本文

导出引用
刘兴宗, 唐春安, 孙润. 蓄水期大岗山右岸抗剪洞加固及其效果分析[J]. 长江科学院院报. 2019, 36(11): 104-109 https://doi.org/10.11988/ckyyb.20180288
LIU Xing-zong, TANG Chun-an, SUN Run. Reinforcement Mechanism and Effectiveness of Anti-shear Galleries in the Right Bank of Dagangshan Hydropower Station in the Process of Reservoir Impoundment[J]. Journal of Changjiang River Scientific Research Institute. 2019, 36(11): 104-109 https://doi.org/10.11988/ckyyb.20180288
中图分类号: TV223   

参考文献

[1] BARLA G, PARONUZZI P. The 1963 Vajont Landslide: 50th Anniversary[J]. Rock Mechanics and Rock Engineering, 2013, 46(6): 1267-1270.
[2] 陈晓平. 基于滑带土强度特性的水库蓄水诱发滑坡研究综述[J]. 水利水电科技进展, 2010, 30(3): 77-83.
[3] CARPENTER J H. Landslide Risk along Lake Roosevelt[D]. Cambridge, Massachusetts: Massachusetts Institute of Technology, 1984.
[4] 中村浩之, 王恭先. 论水库滑坡[J]. 水土保持通报, 1990, 10(1): 53-64.
[5] 王士天, 刘汉超,张倬元,等. 大型水域水岩相互作用及其环境效应研究[J]. 地质灾害与环境保护, 1997, 8(1): 69-89.
[6] 翟才旺. 水利水电岩质边坡的加固技术综述[J]. 广西水利水电, 2002(3): 1-4.
[7] 宁 宇,徐卫亚,郑文棠,等.白鹤滩水电站拱坝及坝肩加固效果分析及整体安全度评价[J].岩石力学与工程学报, 2008, 27(9): 1890-1898.
[8] 向柏宇,姜清辉,周 钟,等.深埋混凝土抗剪结构加固设计方法及其在大型边坡工程治理中的应用[J].岩石力学与工程学报, 2012, 31(2): 289-302.
[9] 马 克, 唐春安, 李连崇, 等. 基于微震监测与数值模拟的大岗山右岸边坡抗剪洞加固效果分析[J]. 岩石力学与工程学报, 2013, 32(6): 1239-1247.
[10]黎满林, 卫 蔚, 张荣贵. 大岗山右岸边坡卸荷裂隙密集带加固及稳定性评价研究[J]. 岩石力学与工程学报, 2014, 33(11): 2276-2282.
[11]徐奴文, 唐春安, 沙 椿, 等. 锦屏一级水电站左岸边坡微震监测系统及其工程应用[J]. 岩石力学与工程学报, 2010, 29(5): 915-925.
[12]徐奴文, 唐春安, 吴思浩, 等. 微震监测技术在大岗山水电站右岸边坡中的应用[J]. 防灾减灾工程学报, 2010,30(增刊1): 216-221.
[13]徐奴文, 梁正召, 唐春安, 等. 基于微震监测的岩质边坡稳定性三维反馈分析[J]. 岩石力学与工程学报, 2014,33(增刊1): 3093-3104.
[14] TANG C, LI L, XU N, et al. Microseismic Monitoring and Numerical Simulation on the Stability of High-steep Rock Slopes in Hydropower Engineering[J]. Journal of Rock Mechanics and Geotechnical Engineering, 2015, 7(5):493-508.

基金

国家自然科学基金国家重大科研仪器研制项目(51627804)