长江科学院院报 ›› 2018, Vol. 35 ›› Issue (4): 109-116.DOI: 10.11988/ckyyb.20161260

• 岩土工程 • 上一篇    下一篇

小净距隧道群稳定性判定因素及施工顺序优化研究

杜德持1, 王渭明1, 刘鹏2, 吕显州1, 张为社1   

  1. 1.山东科技大学 土木工程与建筑学院,山东 青岛 266590;
    2.中铁隧道勘测设计院有限公司,天津 300133
  • 收稿日期:2016-11-30 出版日期:2018-04-01 发布日期:2018-04-16
  • 通讯作者: 王渭明(1955-),男,江西抚州人,教授,博士,博士生导师,从事岩石力学与地下工程方面的教学与科研工作。 E-mail:wang@sdust.edu
  • 作者简介:杜德持(1993-),男,山东济宁人,硕士研究生,主要从事隧道与地下工程的研究。 E-mail:dudechi@163.com
  • 基金资助:
    国家自然科学基金项目(41472280)

Determinant Factors of Stability and Optimization of Construction Sequence in Tunnel Group with Small Clear Distance

DU De-chi1, WANG Wei-ming1, LIU Peng2, LÜ Xian-zhou1, ZHANG Wei-she1   

  1. 1.School of Civil Engineering and Architecture, Shandong University of Science and Technology,Qingdao 266590, China;
    2.China Railway Tunnel Survey & Design Institute Co., Ltd., Tianjin 300133, China
  • Received:2016-11-30 Published:2018-04-01 Online:2018-04-16

摘要: 小净距隧道群存在多种稳定性判定因素,为确定各判定因素之间的关联程度,以青岛地铁敦化路站为工程背景,结合修正Drucker-Prager模型,采用有限差分软件,得出6种不同施工方案下的最大拱顶沉降、塑性区体积、夹岩最大剪应力、锚杆最大轴力等判定指标值。以模糊灰色关联理论为基础,分析了各隧道群稳定性判定指标的主次顺序、隧道群施工最优方案。结果表明:锚杆最大轴力可作为对隧道群施工稳定性最主要的判定因素,拱顶最大沉降及塑性区体积可较为显著地反映隧道群施工稳定性,夹岩最大应力对稳定性影响较小;方案4及方案5可作为隧道群优选施工方案,等效应力分析验证了这2种方案的合理性。研究结果可供类似地铁工程的隧道稳定分析作参考。

关键词: 小净距隧道群, 稳定性, 判定因素, 模糊灰色关联分析, 方案优选

Abstract: Maximum vault settlement, plastic zone volume, maximum shear rock stress and maximum axial force of bolt etc., are determinant factors which reflect the stability of tunnel group with small clear distance. To investigate into the correlation degree among these factors, we obtained the values of these determinant indexes by using finite difference software together with modified Drucker-Prager model. Dunhua road station of Qingdao metro is taken as engineering background. In line with fuzzy grey relational theory, the order of determinant factors and the optimum scheme of construction sequence are analyzed. Results reveal that maximum axial force of bolt can be taken as the primary determinant factor of tunnel group stability; while maximum vault settlement and plastic zone volume could also reflect the tunnel group stability significantly; maximum shear rock stress has the smallest influence on tunnel group stability. In the present study, scheme 4 and scheme 5 are concluded as the optimum construction sequences, and both are verified by equivalent stress analysis.

Key words: tunnel group with small clear distance, stability, determinant factor, fuzzy grey relational analysis, optimization selection of schemes

中图分类号: