为了探究高海拔地区台阶式溢洪道水力特性,对坝顶位于海拔 2 586.0 m,斜坡角度 θ=32° 的某大坝台阶式溢洪道进行了模型试验。通过改变来流流量,研究了 3 种不同工况下溢洪道台阶竖直面及水平面时均压强、水面线、流速、脉动压强等水力特性。结果表明:在 3 种试验工况下,台阶式溢洪道不仅具有较高消能率,而且不会发生空化空蚀破坏;溢洪道竖直面及水平面压力沿程为跳跃式分布;水深及流速在台阶溢洪道上达到某一值后,基本稳定。该结果可为高海拔地区的台阶式溢洪道优化设计提供参考依据。
Abstract
To explore the hydraulic characteristics of stepped spillway at high altitude, we conducted model test on the stepped spillway of a dam with slope θ=32°and dam crest at elevation 2586.0 m. By changing the incoming flow rate, we compared the hydraulic characteristics (time-averaged pressure in vertical and horizontal planes, water surface profile, flow velocity, and fluctuation pressure) in different conditions. Results prove that in all the three conditions, the stepped spillway has high energy dissipation efficiency and no cavitation. Pressure on step vertical plane and horizontal plane distributes in a bouncing manner along the spillway, and the height of water surface and the flow velocity will keep stable after reaching a certain value.
关键词
台阶式溢洪道 /
水力特性 /
空化空蚀 /
高海拔 /
消能率
中图分类号:TV135.2 /
文献标志码:A 文章编号:1001-5485(2015)10-0038-05
Key words
stepped spillway /
hydraulic characteristics /
cavitation /
high altitude /
energy dissipation rate
{{custom_sec.title}}
{{custom_sec.title}}
{{custom_sec.content}}
参考文献
[1] 汝树勋,段维钧.阶梯式溢流坝[J].四川水力发电, 1992, (2) : 50-54. (RU Shu-xun, DUAN Wei-jun. Stepped Overflow Dam[J]. Sichuan Hydroelectric Power, 1992, (2) : 50-54. (in Chinese))
[2] 张 峰,刘韩生.台阶式溢洪道消能特性的研究[J]. 水利与建筑工程学报, 2012, (8):11-14. (ZHANG Feng, LIU Han-sheng. Study on Energy Dissipation Properties of Stepped Spillway[J]. Journal of Water Resources and Architectural Engineering, 2012, (8):11-14.(in Chinese))
[3] 林可冀,韩 立,邓毅国.大朝山水电站RCC溢流坝宽尾墩、台阶式坝面联合消能工的研究及应用 [J].云南水力发电,2002,18(4):6-15. (LIN Ke-ji, HAN Li, DENG Yi-guo. Study and Application of the Combined Energy Dissipator of RCC Overflow Dam Flaring Piers and Stepped Dam Face in the Dachaoshan Hydropower Plant[J]. Yunnan Water Power, 2002,18(4):6-15. (in Chinese))
[4] 艾克明.台阶式斜槽溢洪道的应用状况浅析[C]∥泄水工程与高速水流.长春:吉林人民出版社,2000:1-9. (AI Ke-ming. Discussion on the Application of Stepped Chute Spillway[C]//Discharge Engineering and High Velocity Flow. Changchun: Jilin People’s Publishing House, 2000: 1-9. (in Chinese))
[5] 高仪生,陈 俊,曾 泳.水布垭溢洪道一级挑流消能试验研究[C]∥泄水工程与高速水流.长春:吉林人民出版社,1998:65-71. (GAO Yi-sheng, CHEN Jun, ZENG Yong. Experimental Research on the Energy Dissipation of Shuibuya Spillway[C]//Discharge Engineering and High Velocity Flow. Changchun: Jilin People’s Publishing House, 1998: 65-71. (in Chinese))
[6] 艾克明.台阶式泄槽溢洪道的水力特性和设计应用[J].水力发电学报,1998,(4):86-95. (AI Ke-ming. Hydraulic Characteristics and Design Application of Stepped Chute Spillways[J]. Journal of Hydroelectric Engineering. 1998,(4): 86-95. (in Chinese))
[7] 何光同,曾宪康,李祖发,等.水东水电站新型消能工结构优化设计[J].水力发电,1994,(9):26-28,62. (HE Guang-tong, ZENG Xian-kang, LI Zu-fa, et al. Optimum Design of new Energy Dissipators of Shuidong Hydropower Station[J]. Water Power, 1994,(9):26-28,62. (in Chinese))
[8] 艾克明.江垭大坝漫溢最大可能洪水(PMF)的水力计算[J]. 湖南水利,1997,(5):5-9. (AI Ke-ming. Hydraulic Calculation of PMF of Jiangya Dam[J]. Hunan Hydropower, 1997, (5): 5-9. (in Chinese))
[9] 赖翼峰,孙永和,陈灿辉. 稿树下水库溢洪道消能工的选择泄水工程与高速水流[C]//长春:吉林人民出版社,1998:61-64. (LAI Yi-feng, SUN Yong-he, CHEN Can-hui. Selection of Dissipator for the Spillway of Gaoshuxia Reservoir[C]//Discharge Engineering and High Velocity Flow. Changchun: Jilin People’s Publishing House, 1998:61-64 (in Chinese))
[10]贺事忠,王美生.阶梯式泄槽消能工的应用[J].南昌水专学报,1998,17(1):32-36. (HE Shi-zhong, WANG Mei-sheng. The Application of Energy Dissipation of Stepped Sluice[J]. Journal of Nanchang College of Water Conservancy and Hydroelectric Power, 1998,17(1): 32-36. (in Chinese))
[11]杨首龙.宽尾墩-阶梯式坝面-戽池联合消能工的水力特性[J].水力发电,1994,(9):29-31. (YANG Shou-long. Hydraulic Characteristic of Flaring Pier Stepped Dam Face-scoop Pool Union Dissipator[J]. Water Power,1994,(9): 29-31. (in Chinese))
[12]付 奎.岗曲河一级水电站侧槽溢洪道上游部分及台阶溢洪道试验研究[D].杨陵:西北农林科技大学,2008. (FU Kui. Test Study on the Upstream Part of Side Channel Spillway and Stepped Spillway of the First Step Hydropower Station in Gangqu River[D]. Yangling: Northwest A & FUniversity, 2008. (in Chinese))
[13]田嘉宁,大津岩夫,李建中,等.台阶式溢洪道各流况的消能特性 [J].水利学报,2003,(4):35-39. (TIAN Jia-ning, OHTSU I, LI Jian-zhong, et al. The Characters of Energy Dissipation under Different Flows on Stepped Spillways[J]. Journal of Hydraulic Engineering, 2003,(4):35-39. (in Chinese))
[14]吴守荣,张建民,许唯临,等.前置掺气坎式阶梯溢洪道体型布置优化试验研究[J].四川大学学报(工程科学版),2008,(5):37-42. (WU Shou-rong, ZHANG Jian-min, XU Wei-lin, et al. Experimental Investigation on Hydraulic Characteristics of the Flow in the Pre-aerator Stepped Spillways[J]. Journal of Sichuan University (Engineering Science ), 2008,(5):37-42.(in Chinese))
[15]盘春军.台阶溢流坝在乐滩水电站中的应用[J].红水河,2006,(2):101-104. (PAN Chun-jun. Application of Stepped Spillway on Letan Hydropower Station[J]. Hongshui River, 2006,(2):101-104. (in Chinese))
[16]唐朝阳.鱼背山水电站溢洪道消能工设计研究[J].水电站设计,1995,(12):30-34. (TANG Chao-yang. Study on Dissipator Design of Spillway of Yubeishan Hydropower Station[J]. Electromechanical Technology of Hydropower Station, 1995,(12):30-34. (in Chinese))
[17]陈 群,戴光清.鱼背山水库岸边阶梯溢洪道流场的三维数值模拟[J].水力发电学报,2002,(3):62-72. (CHEN Qun, DAI Guang-qing. Three-dimensional Numerical Simulation of the Stepped Spillway Overflow at Yubeishan Reservoir[J]. Journal of Hydroelectric Engineering, 2002,(3):62-72. (in Chinese))