地震滞后滑坡的破坏机理及防治措施研究

倪振强,史存鹏,韩涛

长江科学院院报 ›› 2015, Vol. 32 ›› Issue (9) : 63-68.

PDF(2759 KB)
PDF(2759 KB)
长江科学院院报 ›› 2015, Vol. 32 ›› Issue (9) : 63-68. DOI: 10.11988/ckyyb.20140250
工程安全与灾害防治

地震滞后滑坡的破坏机理及防治措施研究

  • 倪振强1,史存鹏2,韩涛1
作者信息 +

Failure Mechanism and Prevention Measures of Lagged Earthquake induced Landslide

  • NI Zhen-qiang1, SHI Cun-peng2, HAN Tao1
Author information +
文章历史 +

摘要

由于地震的强烈震动作用,使一些岩质斜坡内部形成了塑性贯通区,易使斜坡成为不稳定斜坡,遭遇外力作用后就有可能形成地震滞后滑坡。以汶川地震中的某不稳定斜坡为研究对象,利用大型有限元软件ANSYS建立数值模型,研究其地震作用下的动力响应。数值模拟的结果表明:地震波穿越节理面后,发生了较大变化,使节理面上下岩体运动方式不同;岩桥在地震作用下,内部剪应力和拉应力波动较大,最终导致了岩桥的塑性贯通;层间节理位移分布很不均匀,动力响应也有较大不同。最后,根据工程地质勘察结果和不稳定斜坡的特点,确定了潜在的滑动面,并提出了裂缝注浆和削坡减载的治理措施。

Abstract

Under strong earthquake action, plastic zone penetrates through rock slope and makes it unstable. Encountered with external forces these unstable slopes are likely to become lagged landslides. In the present research we established a numerical model using finite element software ANSYS to simulate an unstable slope after Wenchuan earthquake. The simulation revealed that joint surfaces changed a lot after earthquake waves passed through, the movements of rocks on two sides of the joint surface were different; the internal shear stress and tensile stress of rock bridge fluctuated heavily, which induced the penetration of plasticity; the contact sliding distance distributed very unevenly, and the dynamic responses of different positions of joints were quite different. Finally, according to engineering geological survey results and characteristics of unstable slope, we identified the potential sliding surface, and proposed treatment measures including crack-grouting and slope-cutting.

关键词

地震滞后滑坡 / 破坏机理 / 数值模拟 / 位移时程曲线 / 防治措施

Key words

lagged earthquake-induced landslide / failure mechanism / numerical simulation / time-history curve of displacement / prevention measures

引用本文

导出引用
倪振强,史存鹏,韩涛. 地震滞后滑坡的破坏机理及防治措施研究[J]. 长江科学院院报. 2015, 32(9): 63-68 https://doi.org/10.11988/ckyyb.20140250
NI Zhen-qiang, SHI Cun-peng, HAN Tao. Failure Mechanism and Prevention Measures of Lagged Earthquake induced Landslide[J]. Journal of Changjiang River Scientific Research Institute. 2015, 32(9): 63-68 https://doi.org/10.11988/ckyyb.20140250
中图分类号: P642.22   

参考文献

[1] A F Y, KONG J M, NI Z Q. Model Test on Deformation and Failure of Excavated Anti-dip Slope under Seismic Loading[J]. Disaster Advances, 2012, 5(2): 41-47.
[2] 陈 强,汪 洋,周 锋,等. 岩质边坡弹塑性地震响应分析[J]. 长江科学院院报,2013,30(12):60-64. (CHEN Qiang, WANG Yang, ZHOU Feng, et al. Seismic Response of Rock Slope Elastoplasticity[J]. Journal of Yangtze River Scientific Research Institute, 2013, 30(12): 60-64. ( in Chinese))
[3] 苏鹏程,韦方强,程尊兰. 5·12汶川地震对磨子沟的影响及震后泥石流活动状况[J]. 长江科学院院报,2012,29(2):16-23. (SU Peng-cheng, WEI Fang-qiang, CHENG Zun-lan. Debris Flow Activity of Mozi Gully after Wenchuan Earthquake on May 12[J]. Journal of Yangtze River Scientific Research Institute, 2012, 29(2): 16-23. ( in Chinese) )
[4] 胡 波,熊明彪,赵 健,等. 汶川地震前后重灾区水土流失变化特征初步分析[J]. 长江科学院院报,2010,27(11):62-66. (HU Bo, XIONG Ming-biao, 〖JP3〗ZHAO Jiang, et al. Preliminary Analysis of Soil and Water Loss Change before and after Wenchuan Earthquake[J]. Journal of Yangtze River Scientific Research Institute, 2010, 27(11): 62-66. ( in Chinese))
[5] 刘力平,雷尊宇,周富春. 地震边坡稳定分析方法综述[J]. 重庆交通学院学报,2001,20(3):83-88. (LIU Li-ping, LEI Zun-yu, ZHOU Fu-chun. The Evaluation of Seismic Slope Stability Analysis Methods[J]. Journal of Chongqing Jiaotong university, 2001, 20(3):83-88. (in Chinese))
[6] 陈祖煜,汪小刚,杨 健,等. 岩质边坡稳定分析-原理·方法·程序[M]. 北京:中国水利水电出版社,2005. (CHEN Zu-yu, WANG Xiao-gang, YANG Jian, et al. Rock Slope Stability Analysis: Theory, Methods and Programs[M]. Beijing: China Water Power Press, 2005. ( in Chinese))
[7] 倪振强,孔纪名,阿发友,等. 地震作用下折线型滑面斜坡的动力响应[J]. 四川大学学报(工程科学版),2011,43(1):1-6. (NI Zhen-qiang, KONG Ji-ming, A Fa-you, et al. Dynamic Response of Slope with Broken Line Slip Surface under Action of Earthquake[J]. Journal of Sichuan University (Engineering Science Edition), 2011, 43(1): 1-6. (in Chinese))
[8] 蒋 楠,周传波,平 雯,等. 岩质边坡爆破振动速度高程效应[J]. 中南大学学报(自然科学版),2014,45(1):238-243. (JIANG Nan, ZHOU Chuan-bo, PING Wen, et al. Altitude Effect of Blasting Vibration Velocity in Rock Slopes[J]. Journal of Central South University (Science and Technology), 2014, 45(1): 238-243.(in Chinese))
[9] 王环玲,徐卫亚. 高烈度区水电工程岩石高边坡三维地震动力响应分析[J]. 岩石力学与工程学报,2005,24(增2):5890-5895. (WANG Huan-ling, XU Wei-ya. 3D Dynamical Response Analysis of High Rock Slope Related to Hydropower Project in High Intensive Seismic Region[J]. Chinese Journal of Rock Mechanics and Engineering, 2005, 24(Sup.2): 5890-5895. (in Chinese))
[10] 郑颖人. 岩土数值极限分析方法的发展与应用[J]. 岩石力学与工程学报,2012,31(7):1297-1316. (ZHENG Ying-ren. Development and Application of Numerical Limit Analysis for Geological Materials[J]. Chinese Journal of Rock Mechanics and Engineering, 2012,31(7): 1297-1316. (in Chinese))
[11] 刘晶波,王振宇,杜修力,等. 波动问题中的三维时域粘弹性人工边界[J]. 工程力学,2005,22(6):46-51. (LIU Jing-bo, WANG Zhen-yu, DU Xiu-li, et al. Three-dimensional Visco-elastic Artificial Boundaries in Time Domain for Wave Motion Problems[J]. Engineering Mechanics, 2005,22(6):46-51. (in Chinese))
[12] 刘晶波,吕彦东. 结构–地基动力相互作用问题分析的一种直接方法[J]. 土木工程学报,1998,31(3):55-64. (LIU Jing-bo, LV Yan-dong. A Direct Method for Analysis of Dynamic Soil-structure Interaction[J]. China Civil Engineering Journal, 1998, 31(3): 55-64. (in Chinese))

基金

山东省高等学校科技计划项目(J12LG10);聊城大学高层次人才、博士科研启动基金资助

PDF(2759 KB)

Accesses

Citation

Detail

段落导航
相关文章

/