[1] 付文光, 杨志银. 深圳地区基坑工程30年发展综述. 岩土工程学报,2010, 32(增2): 562-565. (FU Wen-guang, YANG Zhi-yin. Summaries of Excavation Pit Engineering in Shenzhen in Recent 30 Years. Chinese Journal of Geotechnical Engineering, 2010, 32(Sup.2): 562-565. (in Chinese))
[2] 董必昌, 邱红胜. 双排桩对边坡稳定影响分析的仿真研究. 武汉理工大学学报(交通科学与工程版),2007, 31(3): 502-505. (DONG Bi-chang, QIU Hong-sheng. Simulation Study on Stability of Slope with Double-row Piles. Journal of Wuhan University of Technology (Transportation Science & Engineering),2007, 31(3): 502-505.(in Chinese))
[3] 聂庆科, 胡建敏, 吴 刚. 深基坑双排桩支护结构上的变形和土压力研究. 岩土力学, 2008, 29(11): 3089-3094. (NIE Qing-ke, HU Jian-min, WU Gang. Deformation and Earth Pressure of a Double-row Piles Retaining Structure for Deep Excavation. Rock and Soil Mechanics, 2008, 29(11): 3089-3094. (in Chinese))
[4] 刘泉声, 付建军. 考虑桩土效应的双排桩模型及参数研究. 岩土力学, 2011, 32(2): 481-486. (LIU Quan-sheng, FU Jian-jun. Research on Model and Parameters of Double-row Piles Based on Effect of Pile-soil Contact. Rock and Soil Mechanics, 2011, 32(2): 481-486. (in Chinese))
[5] 何颐华, 杨 斌, 金宝森, 等. 双排护坡桩试验与计算的研究. 建筑结构学报, 1996, 17(2): 58-66. (HE Yi-hua, YANG Bin, JIN Bao-sen, et al. A Study of the Test and Calculation of Double-row Fender Piles. Journal of Building Structures, 1996, 17(2): 58-66. (in Chinese))
[6] 杜秀忠, 杨光华, 孙昌利, 等. 双排桩支护在某水利基坑中的应用. 岩土工程学报, 2012, 34(增1): 490-494. (DU Xiu-zhong, YANG Guang-hua, SUN Chang-li, et al. Application of Retaining Structure with Double-row Piles in a Hydraulic Excavation. Chinese Journal of Geotechnical Engineering,2012, 34(Sup.1): 490-494.(in Chinese))
[7] 孙 涛, 刘俊岩, 刘 燕. 双排桩支护排距的优化研究. 岩土工程学报, 2012, 34 (增1): 616-620. (SUN Tao, LIU Jun-yan, LIU Yan. Optimal Row Distance of Retaining Structure with Double-row Piles. Chinese Journal of Geotechnical Engineering, 2012, 34(Sup.1): 616-620. (in Chinese))
[8] 王 军, 王 磊, 肖昭然. 双排桩支护排距的有限元分析与研究. 地下空间与工程学报, 2005, 1(6): 1096-1099. (WANG Jun, WANG Lei, XIAO Zhao-ran. Analysis of the Interval between Double-row Piles by Finite Element Method. Chinese Journal of Underground Space and Engineering, 2005, 1(6): 1096-1099. (in Chinese))
[9] 钱同辉, 陈 芳, 程周炳, 等. 框架式双排抗滑桩结构性能研究. 长江科学院院报, 2011, 28(11): 91-95. (QIAN Tong-hui, CHEN Fang, CHENG Zhou-bing, et al. Analysis on the Performance of Double-row Anti-Slide Frame-Piles. Journal of Yangtze River Scientific Research Institute, 2011, 28(11): 91-95.(in Chinese))
[10]杨保全, 丘 滨, 陈先威. 双排桩结构特性及桩体位移有限元计算分析. 长江科学院院报, 2009, 26(7): 52-55. (YANG Bao-quan, QIU Bin, CHEN Xian-wei. Deformation Analysis of Double Row Piles by Finite Element Method . Journal of Yangtze River Scientific Research Institute, 2009, 26(7): 52-55.(in Chinese))
[11]史海莹, 龚晓南. 深基坑悬臂双排桩支护的受力性状研究. 工业建筑, 2009, 46(10): 67-71.(SHI Hai-ying, GONG Xiao-nan. Study on the Behavior of Cantilever Double-row Plies Supporting Deep Excavation. Industrial Construction, 2009, 46(10): 67-71. (in Chinese))
[12]应宏伟, 初振环, 李冰河, 等. 双排桩支护结构的计算方法研究及工程应用. 岩土力学, 2007, 28(6): 1145-1150. (YING Hong-wei, CHU Zhen-huan, LI Bing-he, et al. Study on Calculation Method of Retaining Structure with Double-row Piles and Its Application. Rock and Soil Mechanics, 2007, 28(6): 1145-1150. (in Chinese))
[13]白 冰, 聂庆科, 吴 刚, 等. 考虑空间效应的深基坑双排桩支护结构计算模型. 建筑结构学报, 2010, 31(8): 118-124. (BAI Bing, NIE Qing-ke, WU Gang, et al. A Calculation Model for Double-row-pile Retaining Structures in Deep Foundation Pit Considering 3D Effects. Journal of Building Structures, 2010, 31(8): 118-124. (in Chinese))
[14]秦四清, 万林海, 汤天鹏, 等. 深基坑工程优化设计. 北京:地震出版社, 1998. (QIN Si-qing, WAN Lin-hai, TANG Tian-peng, et al. Optimizing Design on Deep Excavation. Beijing: Seismological Press, 1998. (in Chinese))