High pressure rotary jet grouting and large diameter drilling are integrated to treat the seepage of levees at Liaofang hydropower station in Jiangxi Province. Typical segments are selected for the jet grouting test. The grouting result is inspected and analysed to obtain technical parameters of the jet grouting. Through in-site test and water storage operation, this technique is verified to have good effect and sound quality in sandy gravel stratum. It could be a reference for the application of high pressure jet grouting in other seepage prevention projects.
WANG Gang
,
ZHANG Song
. Integration of Large Diameter Drilling and
High Pressure Jet Grouting:A Case of Application[J]. Journal of Changjiang River Scientific Research Institute, 2014
, 31(12)
: 135
-138
.
DOI: 10.3969/j.issn.1001-5485.2014.12.027
[1] 张 松,陈伟业.三峡船闸下游隔流堤及施工围堰高喷防渗施工[J].人民长江,1999,30(9):11-12. (ZHANG Song, CHEN Wei-ye. High Pressure Jet Grouting Applied on the Construction of Downstream Separation Levee and Cofferdam in Ship Lock of The Three Gorges Project[J]. Yangtze River, 1999, 30(9): 11-12. (in Chinese))
[2] 詹青文. 廖坊水库八堡堤砼防渗墙渗漏缺陷分析研究[R].南昌:江西省水利规划设计院,2009.(ZHAN Qing-wen. Report of the Seepage Prevention Defect in Cutoff Wall of Babao Levee of Liaofang Reservoir[R]. Nanchang: Jiangxi Provincial Water Conservancy Planning and Designing Institute, 2009.(in Chinese))
[3] DL/T 5200—2004,水电水利工程高压喷射灌浆技术规范[S]. 北京:中国电力出版社,2004. (DL/T 5200—2004, Technical Specification of Jet Grouting for Hydropower and Water Resources Project[S]. Beijing: China Electric Power Press, 2004. (in Chinese))