CONSTRUCTION AND MANAGEMENT OF WATER CONSERVANCY PROJECTS

FAHP Evaluation Model for Programme Risk Based on Reliability Analysis

  • JIANG Xin ,
  • LI Qi ,
  • ZHAO Jing
Expand
  • 1.College of Hydraulic & Environmental Engineering, China Three Gorges University, Yichang 443002, China;
    2.Danjiangkou Real Estate Co., Ltd., Hanjiang Group, Danjiangkou 442700, China

Received date: 2014-01-08

  Revised date: 2014-09-04

  Online published: 2014-09-04

Abstract

To solve the reliability issues of evaluator’s subjective estimates when evaluating programme risk, we introduced reliability analysis into programme risk estimation to improve the FAHP (Fuzzy Analytical Hierarchy Process) evaluation method. We substituted the interval estimation of evaluators with point estimation, and quantified the estimation interval given by the estimator according to the principle of set-valued statistics, thus obtaining the degree of reliability of evaluator’s subjective estimate. On this basis, we built the FAHP risk evaluation model and apply it to the evaluation of a case of road network around a hydropower reservoir. Results showed that the risk level of the programme is 0.363, which belongs to small risk.

Cite this article

JIANG Xin , LI Qi , ZHAO Jing . FAHP Evaluation Model for Programme Risk Based on Reliability Analysis[J]. Journal of Changjiang River Scientific Research Institute, 2014 , 31(9) : 126 -131 . DOI: 10.3969/j.issn.1001-5485.2014.09.024

References

[1] 江 新,赵 静. 工程项目群的AHP-NET风险评价模型[J]. 中国安全科学学报,2012, 22(10): 158-163. (JIANG Xin, ZHAO Jing. Study on AHP-NET Risk Evaluation Model of Construction Programme[J]. China Safety Science Journal, 2012, 22(10): 158-163. (in Chinese))
[2] 金菊良,刘永芳,丁 晶, 等. 城市防洪工程经济风险分析的蒙特卡洛法[J]. 长江科学院院报,2003, 20(1): 40-43. (JIN Ju-liang, LIU Yong-fang, DING Jing, et al. Monte-Carlo Method for Economical Risk Analysis in Urban Flood Control Engineering[J]. Journal of Yangtze River Scientific Research Institute, 2003, 20(1): 40-43. (in Chinese))
[3] 赖成光,王兆礼,宋海娟. 基于BP神经网络的北江流域洪灾风险评价[J]. 水电能源科学,2011, 29(3): 57-59,161. (LAI Cheng-guang, WANG Zhao-li, SONG Hai-juan. Risk Assessment of Flood Hazard in Beijiang River Basin Based on BP Neural Network[J]. Water Resources and Power, 2011, 29(3): 57-59,161. (in Chinese))
[4] 张 慧,杨建斌. 水利投资项目多目标模糊综合评价方法应用探析[J]. 长江科学院院报,2006, 23(5): 52-55. (ZHANG Hui, YANG Jian-bin.Exploration on Application of Multipurpose Fuzzy Synthetic Assessment Method Water Conservancy Investment Projects[J]. Journal of Yangtze River Scientific Research Institute, 2006, 23(5): 52-55. (in Chinese))
[5] 许应石,李长安,张中旺, 等. 湖北省水资源短缺风险评价及对策[J]. 长江科学院院报,2012, 29(11):5-10. (XU Ying-shi, LI Chang-an, ZHANG Zhong-wang, et al. Risk Assessment and Countermeasures of Water Shortage in Hubei Province[J]. Journal of Yangtze River Scientific Research Institute, 2012, 29(11): 5-10. (in Chinese))
[6] 赵东元,樊 虎,任志久. 可靠性工程与应用[M]. 北京:国防工业出版社,2009:1-3. (ZHAO Dong-yuan, FAN Hu, REN Zhi-jiu. Reliability Engineering and Applications[M]. Beijing: National Defence Industry Press, 2009:1-3. (in Chinese))
[7] 黄继鸿,柯孔林. 基于集值统计的技术创新风险度量及其预警[J]. 科学研究,2005, 23(2): 273-276. (HUANG Ji-hong, KE Kong-lin. The Evaluating and Forecasting of Technology Innovation Risk Based on Set-value Statistics[J]. Studies in Science, 2005, 23(2): 273-276. (in Chinese))
[8] 罗承忠. 随机模糊集及其落影大数定理[J]. 模糊系统与数学,1992, 6(2): 93-102. (LUO Cheng-zhong. Random Fuzzy Sets and the Theorem of Great Numbers of Fall-Shadow[J]. Fuzzy Systems and Mathematics, 1992, 6(2): 93-102. (in Chinese))
[9] 赵泱军,李同春,石永超, 等. 可拓评判法在水库溃坝风险分析中的应用[J]. 三峡大学学报(自然科学版),2013, 35(6): 16-19. (ZHAO Yang-jun, LI Tong-chun, SHI Yong-chao, et al. Application of Extenics to Evaluation of Risk Analysis of Reservoir Dam Break[J]. Journal of China Three Gorges University(Natural Sciences),2013, 35(6): 16-19. (in Chinese))
[10]陈 进. 大型水利工程的风险管理问题[J]. 长江科学院院报,2012, 29(12): 15-19. (CHEN Jin. Risk Management of Large Water Conservancy Projects[J]. Journal of Yangtze River Scientific Research Institute, 2012, 29(12): 15-19. (in Chinese))
[11]徐 林,刘敏芝. 基于AHP-CIM模型水闸工程投资风险分析[J]. 三峡大学学报(自然科学版),2012, 34(3): 25-29. (XU Lin, LIU Min-zhi. Investment Risk Analysis of Sluice Project Based on AHP-CIM Model[J]. Journal of China Three Gorges University(Natural Sciences), 2012, 34(3): 25-29. (in Chinese))
[12]陈立文. 项目投资风险分析理论与方法[M]. 北京:机械工业出版社,2004:98-106. (CHEN Li-wen. Theories and Methods for Analysis of Project Investment Risk[M]. Beijing: China Machine Press, 2004:98-106. (in Chinese))
Outlines

/