Orignal Article

Causes and Control Measures of MixedFree-Surface-Pressure Flow in Steep-Grade Tunnel

  • LI Xue-hai ,
  • LI Heng ,
  • SHI Jiao-hao
Expand
  • 1.Hydraulics Department, Yangtze River Scientific Research Institute, Wuhan 430010, China;
    2.Changjiang Institute of Survey, Planning, Design and Research,Changjiang Water Resources Commission, Wuhan 430010, China

Received date: 2013-05-03

  Revised date: 2013-08-13

  Online published: 2013-08-13

Abstract

The mixed free-surface-pressure flow which is easily formed in steep-grade tunnels results in cavitation erosion, vibration and impact damage. On the basis of model test data of steep-grade tunnels, the influencing factors and the control measures of mixed free-surface-pressure flow in steep-grade tunnel is researched. It’s found that the main influencing factors include relative submerge depth H/a, tunnel shape (bottom slope, inlet top shape, tunnel height, tunnel length, bending section, gate shaft), inlet approach channel arrangement and the consequent air suction swirl and air intake in the gate shaft. According to the terrain condition, geological condition, project function, operation safety and economic factor, measures as follows can be adopted to control the mixed free-surface-pressure flow in steep-grade tunnel vortex suppression, air intake suppression in gate shaft, and optimization of inlet top shape, tunnel height and tunnel length.

Cite this article

LI Xue-hai , LI Heng , SHI Jiao-hao . Causes and Control Measures of MixedFree-Surface-Pressure Flow in Steep-Grade Tunnel[J]. Journal of Changjiang River Scientific Research Institute, 2013 , 30(8) : 40 -45 . DOI: 10.3969/j.issn.1001-5485.2013.08.0;2013,30(08)

References

[1] 李学海,石教豪,曾正春.马来西亚某水电站施工导流(两洞方案)1∶80水工整体模型试验成果报告[R].武汉:长江科学院,2009.(LI Xue-hai, SHI Jiao-hao, ZENG Zheng-chun. Report on the 1∶80 Integral Hydraulic Model Experiment for the Construction Diversion (Double-Tunnel Scheme) of a Hydropower Station in Malaysia [R]. Wuhan: Yangtze River Scientific Research Institute, 2009.(in Chinese))
[2] 李学海,石教豪,曾正春.马来西亚某水电站施工导流(单洞方案)1∶80水工整体模型试验成果报告[R].武汉:长江科学院,2009.(LI Xue-hai, SHI Jiao-hao, ZENG Zheng-chun. Report on the 1∶80 Integral Hydraulic Model Experiment for the Construction Diversion (Single Tunnel Scheme) of a Hydropower Station in Malaysia [R]. Wuhan: Yangtze River Scientific Research Institute, 2009.(in Chinese))
[3] 马永锋,余胜祥,陈超敏.陡坡导流隧洞结构设计实践[J].人民长江,2011,42(16):18-20.(MA Yong-feng, YU Sheng-xiang, CHEN Chao-min. Practice of Structural Design of Steep Diversion Tunnel[J]. Yangtze River, 2011,42(16):18-20.(in Chinese))
[4] 石教豪,盛 君.缅甸某水电站下坝线混凝土重力坝方案支流施工导流1∶85水工整体模型试验研究报[R].武汉:长江科学院,2011.(SHI Jiao-hao, SHENG Jun. Report on the 1∶85 Integral Hydraulic Model Experiment for the Construction Diversion of the Tributary of a Hydropower Station in Burma[R]. Wuhan: Yangtze River Scientific Research Institute, 2011.(in Chinese))
[5] CHAUDHRY M H. 实用水力过渡过程[M].陈家远, 孙诗杰, 张治滨,译. 成都:四川省水力发电工程学会,1985.(CHAUDHRY M H. Practical Hydraulic Transition Process[M]. Translated by CHEN Jia-yuan, SUN Shi-jie, ZHANG Zhi-bing. Chengdu: Sichuan Provincial Society of Water Power Engineering, 1985.(in Chinese))
[6] WIGGERT D C. Transient Flow in Free-Surface, Pressurized Systems[J]. Journal of the Hydraulics Division, 1972, 98 (1): 11-27.
[7] SONG C, CARDIE J, LEUNG K. Transient Mixed Flow Models for Storm Sewers[J]. Journal of Hydraulic Engineering, ASCE, 1983, 109(11): 1487-1504.
[8] 许景贤,林斌良. 二滩水电站尾水隧洞过渡过程中明满流的试验研究[J].水力发电学报,1990, (4):58-70.(XU Jing-xian, LIN Bin-liang. Experimental Study on Mixed Free-Surface-Pressure Flow in Transition Process of Tail Tunnel for Ertan Hydropower Station[J]. Journal of Hydroelectric Engineering, 1990, (4):58-70.(in Chinese))
[9] 许景贤,丁振华.导流洞改作水电站尾水洞过渡过程明满流机理[J].天津大学学报,1996,29(5):664-672.(XU Jing-xian, DING Zhen-hua. Study on Mechanism of Free Surface-Pressurized Flow in Transforming Diversion Tunnel into Hydropower Tailrace Tunnel[J]. Journal of Tianjin University, 1996,29(5):664-672.(in Chinese))
[10]丁振华,许景贤.导流洞改作发电尾水洞过渡过程中明满流的数学模型[J].水利学报,1996,(9):1-10,21.(DING Zhen-hua, XU Jing-xian. A Mathematical Model for Simulation of Transient Flow in Tailrace Tunnel Transformed from Diversion Tunnel[J]. Journal of Hydraulic Engineering, 1996, (9):1-10,21.(in Chinese))
[11]陈家远.水电站尾水系统中明满交替水流的数学模拟研究[J].水力发电学报,1994,(4):51-60.(CHEN Jia-yuan. Mathematical Simulation Study on Mixed Free-Surface-Pressure Flow in Tail Water System of Hydropower Station[J]. Journal of Hydroelectric Engineering, 1994,(4):51-60.(in Chinese))
[12]李 辉,陈乃祥,樊红刚,等.具有明满交替流动的三峡右岸地下电站的动态仿真[J].清华大学学报:自然科学版,1999,39(11):29-31.(LI Hui, CHEN Nai-xiang, FAN Hong-gang, et al. Transient Simulation with MFSPF for Right Bank Underground Hydropower Station of the Three Gorges[J]. Journal of Tsinghua University(Science and Technology), 1999,39(11):29-31.(in Chinese))
[13]陈乃祥,孔庆蓉,樊红刚,等.明满交替流特征隐式格式法计算模型在工程中的应用研究[J].水力发电学报,2005,24(5):85-89.(CHEN Nai-xiang, KONG Qing-rong, FAN Hong-gang, et al. Research on Characteristic Implicit Method Applied for Calculating Mixed Free-Surface to Pressure Flow in Model of Project[J]. Journal of Hydroelectric Engineering, 2005,24(5):85-89.(in Chinese))
[14]樊红刚,陈乃祥.明满混合瞬变流动仿真计算分析[J].清华大学学报:自然科学版,2000,40(11):63-66.(FAN Hong-gang, CHEN Nai-xiang. Simulation of Transient Mixed Free Surface Pressure Flow[J]. Journal of Tsinghua University (Science and Technology), 2000,40(11):63-66.(in Chinese))
[15]樊红刚, 陈乃祥, 杨 琳,等.明满交替流动计算方法研究及其实验验证[J].工程力学,2006,23(6):16-20.(FAN Hong-gang, CHEN Nai-xiang, YANG Lin, et al. Numerical Simulation and Experimental Verification of Transient Mixed Free-Surface-Pressure Flow[J]. Engineering Mechanics, 2006,23(6):16-20.(in Chinese))
[16]褚宝鑫,樊红刚,陈乃祥.具有明满交替流大型水电站的动态数值模拟及优化设计研究[J].工程力学,2003,20(4):166-170.(CHU Bao-xin, FAN Hong-gang, CHEN Nai-xiang. Simulation and Optimum Design of Transient Mixed Free-Surface-Pressure Flow for the Hydropower Station[J]. Engineering Mechanics, 2003,20(4):166-170.(in Chinese))
[17]杨开林. 明渠结合有压管调水系统的水力瞬变计算[J].水利水电技术,2002,33(4):5-9.(YANG Kai-lin. Simulation of Hydraulic Transients in Water Diversion Projects with Open Channels and Pressurized Pipelines[J]. Water Resources and Hydropower Engineering, 2002,33(4):5-9.(in Chinese))
[18]郭晓晨,周玉文.明满交替流数值模拟中的精细积分法[J].水动力学研究与进展:A辑,2006,21(4):533-537.(GUO Xiao-chen, ZHOU Yu-wen. Precise Integration Method for Numerical Simulation of Transient Mixed Free-Surface-Pressure Flow[J]. Journal of Hydrodynamics(Ser.A), 2006,21(4):533-537.(in Chinese))
[19]陈 杨,俞国青.明满流过渡及跨临界流一维数值模拟[J].水利水电科技进展,2010,30(1):80-84,94.(CHEN Yang, YU Guo-qing. One-dimensional Numerical Simulation of Transcritical Flows and Transition Between Free Surface and Pressurized Flows[J]. Advances in Science and Technology of Water Resources, 2010,30(1):80-84,94.(in Chinese))
[20]茅泽育,赵雪峰,赵 璇, 等.排水管网非恒定流数值模拟新方法[J]. 水利水运工程学报,2007,(2):42-47.(MAO Ze-yu, ZHAO Xue-feng, ZHAO Xuan, et al. A New Method for Simulation of Unsteady Flow within Drainage Network[J]. Hydro-Science and Engineering, 2007,(2):42-47.(in Chinese))
[21]冯良记,张明亮. 城市排水管网明满过渡流模型的研究及应用[J].中国给水排水,2009,(23):131-137.(FENG Liang-ji, ZHANG Ming-liang. Study and Application of Free-surface-pressurized Flow Mathematical Model for Urban Drainage Networks[J]. China Water and Wastewater, 2009, (23):131-137.(in Chinese))
[22]汪 俊,桂 林.有压输水管道中明满流产生与进口段布置的关系探讨[J]. 四川水利,2007,28(4):32-34.(WANG Jun, GUI Lin. Exploring the Relationship between Mixed Free-Surface-Pressure Flow and Inlet Section Arrangement in Pressure Conduit[J]. Sichuan Water Conservancy, 2007,28(4):32-34.(in Chinese))
[23]李 炜.水力计算手册(第2版)[M]. 北京:中国水利水电出版社,2006.(LI Wei. Manual of Hydraulic Calculation (Second Edition)[M]. Beijing: China Water Power Press, 2006.(in Chinese))
[24]马吉明.弯道隧洞内的明满流现象及有关水力学问题[J].红水河,1997,16(1):23-24.(MA Ji-ming. Mixed Free-Surface-Pressure Flow in Curved Tunnel and the Related Hydraulics Problems[J]. Hongshui River, 1997,16(1):23-24.(in Chinese))
[25]李学海. 江坪河水电站施工导流试验报告[R].武汉:长江科学院,2004.(LI Xue-hai. Report on the Integral Hydraulic Model Experiment for the Construction Diversion of Jiangpinghe Hydropower Station[R]. Wuhan: Yangtze River Scientific Research Institute, 2004.(in Chinese))
Outlines

/

〈 〉