Advances in Research on Flood Discharge Atomization

  • WANG Si-ying ,
  • WANG Cai-huan ,
  • CHEN Duan
Expand
  • Hydraulics Department, Yangtze River Scientific Research Institute, Wuhan 430010, China

Received date: 2012-07-16

  Revised date: 2013-07-03

  Online published: 2013-07-03

Abstract

Flood discharge atomization of high dam projects will have possible negative impact on the hydropower station operation, traffic safety, surrounding environment, and even the stability of the downstream bank slope. Researchers have done much work in this regard, and meanwhile there is still much work to do because of its significance and complexity. This paper presents a full scale review on current study on this issue, summarizes the cognition on its damage, the forming mechanism of the atomization, and the comparison of different experimental and numerical research results. It’s proposed that two aspects should be focused on in the future study: first, advanced measuring equipment and methods should be imported and invented to obtain more particular and accurate information; second, properties of the atomization source should be paid more attention to.

Cite this article

WANG Si-ying , WANG Cai-huan , CHEN Duan . Advances in Research on Flood Discharge Atomization[J]. Journal of Changjiang River Scientific Research Institute, 2013 , 30(7) : 53 -58 . DOI: 10.3969/j.issn.1001-5485.2013.07.011

References

[1] 刘敏南. 东江水电站滑雪式溢洪道泄洪雾化原型观测[C]∥泄水工程与高速水流论文集. 成都:成都科技大学出版社,1994.(LIU Min-nan. Prototype Observation on Flood Discharge Atomization of the Skiing Type Spillway in Dongjiang Hydropower Station[C]∥Proceedings of the Symposium on Dissipation Construction and High-Speed Flow. Chengdu: Chengdu University of Science and Technology Press,1994.(in Chinese)
[2] 陈维霞. 鲁布革水电站泄水建筑物雾化原型观测[R]. 昆明:电力部昆明勘测规划设计院,1996.(CHEN Wei-xia. Prototype Observation on Flood Discharge Atomization in Lubuge Hydropower Station[R]. Kunming: Hydrochina Kunming Engineering Corporation,1996.(in Chinese)
[3] 陈慧玲. 乌江东风水电站水力学原型观测-泄洪雾化观测报告[R]. 南京:南京水利水电研究院, 1997.(CHEN Hui-ling. Hydraulic Prototype Observation on Wujiang Dongfeng Hydropower Station: Report on Flood Discharge Atomization[R]. Nanjing: Nanjing Water Resources & Hydropower Research Institute, 1997.(in Chinese)
[4] 宋学礼. 浅析白山泄洪雾化的几个问题[J]. 东北水利水电, 1997, 15(1):40-42.(SONG Xue-li. Analysis on Several Problems of Baishan Release Flood Water Atomization[J]. Water Resources & Hydropower of Northeast, 1997, 15(1):40-42.(in Chinese)
[5] 刘进军,韩 爽,孔德勇,等. 白山电站泄洪雾化原型观测与模型试验研究[J].东北水利水电,2002,20(2):41-45,56. (LIU Jin-jun, HAN Shuang, KONG De-yong, et al. Prototype Observation and Model Test Study on Flood Discharge Atomization in Baishan Hydropower Station[J]. Water Resources & Hydropower of Northeast, 2002, 20(2):41-45, 56.(in Chinese)
[6] 宋恩来. 白山水电站泄洪“雾化”和溅水研究, 东北电力技术[J], 2002,(8):9-13.(SONG En-lai. Research on the Leakage Flow “Atomizer” and Sputter of Baishan Hydropower Station[J]. Power Technology of Northeast,2002, (8):9-13.(in Chinese)
[7] 吴修锋, 吴时强, 周 辉, 等. 湾塘水电站泄洪雾化原型观测[J].水利水运工程学报, 2001,(4):71-74.(WU Xiu-feng, WU Shi-qiang, ZHOU Hui, et al. Atomization Measurement of Wantang Hydropower Station[J]. Hydro-science and Engineering, 2001, (4):71-74.(in Chinese)
[8] 张 华,练继建. 水电站底流消能雾化的研究[J].水利水电技术,2001,32(12):67-72.(ZHANG Hua, LIAN Ji-jian. Research on the Atomization of Underflow Energy Dissipation in Hydropower Stations[J]. Water Resource and Hydropower Engineering, 2001, 32(12):67-72.(in Chinese)
[9] 李 瓒. 龙羊峡水电站挑流水雾诱发滑坡问题[J].大坝与安全,2001,(3):17-20,29. (LI Zan. On Landslide Induced by Water-Fog from Ski-Jump Energy Dissipation of Longyangxia Hydropower Station[J]. Dam and Safety, 2001, (3):17-20, 29. (in Chinese) )
[10]苏建明,李浩然. 二滩水电站泄洪雾化对下游边坡的影响[J].水文地质工程地质,2002,(2):22-24.(SU Jian-ming, LI Hao-ran. Effects of Flood Discharge Atomization on Downstream Slope of Ertan Hydropower Station[J]. Hydrogeology and Engineering Geology, 2002, (2):22-24.(in Chinese)
[11]张宇鹏,黄国兵,徐勤勤. 挑流泄洪雾化降雨强度的模糊综合评判预报[J].长江科学院院报,2007,24(1):1-3.(ZHANG Yu-peng, HUANG Guo-bing, XU Qin-qin. Fuzzy Synthetic Evaluation Prediction for Atomized-Rain of Jet Overflow[J]. Journal of Yangtze River Scientific Research Institute, 2007, 24(1):1-3.(in Chinese)
[12]梁再潮. 雾化水流溅水区的分析和计算[J].长江科学院院报,1996,13(1):9-13.(LIANG Zai-chao. Analysis and Computation for Droplets-Splashing Region of Atomization Water Flow[J]. Journal of Yangtze River Scientific Research Institute, 1996, 13(1):9-13.(in Chinese)
[13]姚克烨,曲景学. 挑流雾化机理及分区研究综述[J]. 东北水利水电, 2007,(4):7-9,71.(YAO Ke-ye, QU Jing-xue. Summarization of Trajection Flood Discharging Atomization Mechanism and Subzone Study[J]. Water Resources & Hydropower of Northeast, 2007, (4):7-9, 71.(in Chinese)
[14]柴恭纯,陈慧玲. 高坝泄洪雾化问题的研究[J].山东工业大学学报,1992,22(3):29-35.(CHAI Gong-chun, CHEN Hui-ling. Study on Flood Discharge Atomization from High Dams[J]. Journal of Shandong Polytechnic University, 1992, 22(3):29-35.(in Chinese)
[15]陈 端, 李 静, 李 利. 水电站泄洪雾化预测技术研究[R].武汉:长江科学院,2005.(CHEN Duan, LI Jing, LI Li. Study on the Prediction Technique of Flood Discharging Atomization[R]. Wuhan: Yangtze River Scientific Research Institute, 2005.(in Chinese)
[16]刘宣烈,张文周. 空中水舌运动特性研究[J].水力发电学报,1988,(2):46-54.(LIU Xuan-lie, ZHANG Wen-zhou. Study on the Motion Characteristics of Jet in the Air[J]. Journal of Hydroelectric Engineering, 1988, (2):46-54.(in Chinese)
[17]刘宣烈,刘 钧. 三元空中水舌掺气扩散的试验研究[J].水利学报, 1989,(11):9-17.(LIU Xuan-lie, LIU Jun. Experimental Study on the Diffusion and Aeration of Three-Dimensional Jet[J]. Journal of Hydraulic Engineering, 1989, (11):9-17.(in Chinese)
[18]梁再潮. 雾化水流计算模式[J]. 水动力学研究与进展(A), 1992,7(3): 247-255.(LIANG Zai-chao. A Computation Model for Atomization Flow[J]. Journal of Hydrodynamics (Series A), 1992, 7(3):247-255.(in Chinese)
[19]张 华,练继建,李会平. 挑流水舌的水滴随机喷溅数学模型[J].水利学报,2003,(8):21-25.(ZHANG Hua, LIAN Ji-jian, LI Hui-ping. Mathematical Model of Droplet Randomly Formed by Splash of Nappe[J]. Journal of Hydraulic Engineering, 2003, (8):21-25.(in Chinese)
[20]张 华,练继建. 底流泄洪雾化对下游环境影响预测[J]. 华北电力大学学报, 2005,32(1):107-112.(ZHANG Hua, LIAN Ji-jian. Numerical Forecasting of Hydraulics Atomization on Environment[J]. Journal of North China Electric Power University, 2005, 32(1):107-112.(in Chinese)
[21]柳海涛,刘之平,孙双科. 水舌入水喷溅的随机数学模型[J].水利水电科技进展,2009,29(6):1-4.(LIU Hai-tao, LIU Zhi-ping, SUN Shuang-ke. A Stochastic Mathematical Model of the Computation of Splashing from Water Jets[J]. Advances in Science and Technology of Water Resources, 2009, 29(6):1-4.(in Chinese)
[22]陈慧玲.小湾水电站泄洪雾化研究[J].云南水力发电, 1998,14(4):51-55.(CHEN Hui-ling. Study of Flood Discharging Atomization for Xiaowan Hydropower Project[J]. Yunnan Water Power, 1998, 14(4):51-55.(in Chinese)
[23]黄国情, 吴时强, 陈惠玲. 高坝泄洪雾化模型试验研究[J].水利水运工程学报,2008,(4): 91-94.(HUANG Guo-qing, WU Shi-qiang, CHEN Hui-ling. Model Test Studies of Atomized Flow for High Dams[J]. Hydro-Science and Engineering, 2008, (4): 91-94.(in Chinese)
[24]吴时强, 吴修锋,周 辉, 等. 底流消能方式水电站泄洪雾化模型试验研究[J].水科学进展,2008,19(1):84-88.(WU Shi-qiang, WU Xiu-feng, ZHOU Hui, et al. Model Experiment Study of Effect of Discharge Atomization for Energy Dissipation by Hydraulic Jump[J]. Advances in Water Science, 2008, 19(1):84-88.(in Chinese)
[25]周 辉,吴时强,陈慧玲. 泄洪雾化降雨模型相似性探讨[J]. 水科学进展, 2009,20(1):58-62. (ZHOU Hui, WU Shi-qiang, CHEN Hui-ling. Discussion on the Scale Effect of Discharge Atomization-Rainfall Model[J]. Advances in Water Science, 2009, 20(1):58-62.(in Chinese)
[26]陈 端,金 峰,李 静. 高坝泄洪雾化降雨强度模型律研究[J].水利水电技术,2005,36(10):47-49.(CHEN Duan, JIN Feng, LI Jing. Study on Model Law for Rainfall Intensity of Flood-Discharging Atomization of High Dams[J]. Water Resources and Hydropower Engineering, 2005, 36(10):47-49.(in Chinese)
[27]陈 端,金 峰,张 鹤. 构皮滩工程大坝泄洪雾化物理模型试验研究[J].湖北水力发电,2007,(3):48-51.(CHEN Duan, JIN Feng, ZHANG He. Physical Model Test for Flood Discharge Atomization of Goupitan Hydropower Project[J]. Hubei Water Power, 2007, (3): 48-51.(in Chinese)
[28]陈 端,金 峰,向光红. 构皮滩工程泄洪雾化降雨强度及雾流范围研究[J].长江科学院院报,2008,25(1):1-4.(CHEN Duan, JIN Feng, XIANG Guang-hong. Rainfall Intensity and Fog Flow of Flood-Discharge Atomization at Goupitan Project[J]. Journal of Yangtze River Scientific Research Institute, 2008, 25(1):1-4.(in Chinese)
[29]罗福海,李 伟,向光红. 水布垭电站泄洪雾化影响分析及防护设计[J].水利水电快报,2009,30(11):37-39.(LUO Fu-hai, LI Wei, XIANG Guang-hong. Effect Analysis and Protection Design of Flood Discharging Atomization for Shuibuya Hydropower Project[J]. Express of Water Resources and Hydropower Institute, 2009, 30(11):37-39.(in Chinese)
[30]姚克烨,谢 波,曲景学. 泄洪雾化模型试验研究[J].四川水利,2007,(3):19-22.(YAO Ke-ye, XIE Bo, QU Jing-xue. Model Test for the Flood Discharge Atomization[J]. Sichuan Water, 2007, (3):19-22.(in Chinese)
[31]陈 端. 高坝泄洪雾化降雨强度分布及模型律研究[R].武汉:长江科学院, 2010.(CHEN Duan. Study on Distribution and Model Law for Intensity of Rainfall from Atomization of Flood-Discharging Flow for High Dam[R]. Wuhan: Yangtze River Scientific Research Institute, 2010.(in Chinese)
[32]刘宣烈,安 刚,姚仲达. 泄洪雾化机理和影响范围探讨[J].天津大学学报,1991,(9):30-36.(LIU Xuan-lie, AN Gang, YAO Zhong-da. The Investigation on the Mechanism and Sphere of Influence of Atomization by Discharge Flow[J]. Journal of Tianjin University, 1991, (9): 30-36.(in Chinese)
[33]李渭新,王 韦,许唯临, 等. 挑流消能雾化范围的预估[J].四川联合大学学报,1999,3(6):17-23.(LI Wei-xin, WANG wei, XU Wei-lin, et al. A Rough Method to Calculate the Range of Atomized Flow Caused by Jet Impact[J]. Journal of Sichuan Union University, 1999, 3(6): 17-23.(in Chinese)
[34]孙双科,刘之平. 泄洪雾化降雨的纵向边界估算[J].水利学报,2003,(12):53-58.(SUN Shuang-ke, LIU Zhi-ping. Longitudinal Range of Atomized Flow Formed by Discharge of Spillways and Outlet Works in Hydropower Stations[J]. Journal of Hydraulic Engineering, 2003, (12): 53-58.(in Chinese)
[35]刘士和,梁再潮. 深窄峡谷区泄洪雾化及其影响的研究[J].武汉水利电力大学学报,1997,30(4):6-9. (LIU Shi-he, LIANG Zai-chao. On Atomizing Problems by Jumping Jet in Hydropower Station at Narrow and Deep Valley[J]. Journal of Wuhan University of Hydraulic & Electric Engineering, 1997, 30(4):6-9.(in Chinese)
[36]刘士和,曲 波. 泄洪雾化溅水区长度深化研究[J].武汉大学学报(工学版),2003,36(5):5-8.(LIU Shi-he, QU Bo. Investigation on Splash Length of Aerated Jet[J]. Engineering Journal of Wuhan University, 2003, 36(5):5-8.(in Chinese)
[37]戴丽荣,张云芳,张 华,等. 挑流泄洪雾化影响范围的人工神经网络模型预测[J].水利水电技术,2003,34(5):7-9.(DAI LI-rong, ZHANG Yun-fang, ZHANG Hua, et al. An Artificial Neural Network Model of Flood Discharge Atomization Prediction of Hydropower Station[J]. Water Resources and Hydropower Engineering, 2003, 34(5): 7-9.(in Chinese)
[38]彭新民,林 芝,黄财元,等. 挑流泄洪雾化的人工神经网络模型初探[J].中国农村水利水电,2006,(1):60-61,65.(PENG Xin-min, LING Zhi, HUANG Cai-yuan, et al. Pre-test on Artificial Neural Network Model of Flood Discharge Atomization[J]. China Rural Water and Hydropower, 2006, (1):60-61, 65.(in Chinese)
[39]张宇鹏,黄国兵,徐勤勤. 挑流泄洪雾化降雨强度的模糊综合评判预报[J].长江科学院院报,2007,24(1):1-3.(ZHANG Yu-peng, HUANG Guo-bing, XU Qin-qin. Fuzzy Synthetic Evaluation Prediction for Atomized-Rain of Jet Overflow[J]. Journal of Yangtze River Scientific Research Institute, 2007, 24(1):1-3.(in Chinese)
[40]刘惠军,任光明,安世泽. 乌东德水电站泄洪雾化影响范围研究[J].甘肃科学学报,2008,20(3):106-108.(LIU Hui-jun, REN Guang-ming, AN Shi-ze. The Influence Range of Flood Discharge Atomization at Wudongde Hydropower Station[J]. Journal of Gansu Sciences, 2008, 20(3): 106-108.(in Chinese)
[41]李布雳,罗秉珠,陶洪辉. 老挝南塔河1 #水电站泄流雾化研究[J].广西水利水电,2009,(1):16-19.(LI Bu-li, LUO Bing-zhu, TAO Hong-hui. Discharge Atomization Research for Namtha River No. 1 Hydropower Station in Laos[J]. Guangxi Water Resources and Hydropower Engineering, 2009, (1): 16-19.(in Chinese)
[42]孔彩粉,廖忠刚,耿 莉,等. 小浪底工程泄洪雾化影响及其防护[J].华北水利水电学院学报,1999,20(2):18-20,35.(KONG Cai-fen, LIAO Zhong-gang, GENG Li, et al. Effect and Protection of the Overflow Atomization of Xiaolangdi Project[J]. Journal of North China Institute of Water Conservancy and Hydroelectric Power, 1999, 20(2): 18-20, 35.(in Chinese)
[43]王 颖,李志远,李池清. 白山水电站泄洪溅水雾化与防护工程研究[J].水利水电技术,2008,39(6):113-116.(WANG Ying, LI Zhi-yuan, LI Chi-qing. Study on Discharge Splashing Atomization and Protection Works for Baishan Hydropower Station[J]. Water Resources and Hydropower Engineering, 2008, 39(6):113-116.(in Chinese)
[44]向光红,江义兰,金 蕾. 构皮滩水电站泄洪雾化及防护研究[J].贵州水力发电,2002,19(2):34-36.(XIANG Guang-hong, JIANG Yi-lan, JIN Lei. Study on the Analysis and Protection of Discharge Atomization at Goupitan Hydropower Station[J]. Guizhou Water Power, 2002, 19(2):34-36.(in Chinese)
[45]罗福海,李 伟,向光红. 水布垭电站泄洪雾化影响分析及防护研究[J].水利水电快报,2009,30(11):37-39.(LUO Fu-hai, LI Wei, XIANG Guang-hong. Study on the Analysis and Protection of Discharge Atomization at Shuibuya Power Station[J]. Express of Water Resources and Hydropower Institute, 2009, 30(11):37-39.(in Chinese)
[46]薛联芳. 大坝泄洪雾化环境影响及减免措施研究[J].四川水力发电,2005,24(5):104-107.(XUE Lian-fang. Study on the Environmental Impact and Depression Measures of Discharging Atomization[J]. Sichuan Water Power, 2005, 24(5):104-107.(in Chinese)
[47]刘 明,黄润秋,严 明. 锦屏一级水电站IV-VI山梁雾化边坡稳定性分析[J].岩石力学与工程学报,2006,25(增1):2801-2807.(LIU Ming, HUANG Run-qiu, YAN Ming. Study on Stability of Water-Fog Slope on IV-VI Ridges of Jinping First Stage Hydropower Station[J]. Chinese Journal of Rock Mechanics and Engineering, 2006, 25(Sup.1): 2801-2807.(in Chinese)
[48]曾 理,钱晓慧,祈小辉. 雾化雨入渗条件下高拱坝下游边坡稳定性分析[J].人民黄河,2011,33(6):129-131.(ZENG Li, QIAN Xiao-hui, QI Xiao-hui. Stability Analysis of the Downstream Slope of High Arch Dam under Atomized Rain Infiltration[J]. Yellow River, 2011, 33(6):129-131.(in Chinese)
Outlines

/