WANG An quan
,
AI Kai
,
YIN Jian min
. In Situ Geostress Measurement and Analysis for the Power Tunnel of Bakun Hydroelectric Station[J]. Journal of Changjiang River Scientific Research Institute, 2013
, 30(6)
: 72
-75
.
DOI: 10.3969/j.issn.1001-5485.2013.06.016
[1]陈卫忠,朱维申,罗超文. 万家寨引黄工程总干一、二级泵站水力劈裂试验研究[J]. 岩土力学,2001,22(1)26-28.(CHEN Wei zhong,ZHU Wei shen,LUO Chao wen. Hydraulic Jacking Tests at GMPS1 and GMPS2 of Shanxi Yellow River Diversion Project[J]. Rock and Soil Mechanics,2001,22(1) 26-28.(in Chinese)[2]王汇明,张辅纲,王著杰,等. 抽水蓄能电站砼衬砌高压隧洞工程地质条件探讨[J] . 广东水利水电,2006,(11)8-14.(WANG Hui ming,ZHANG Fu gang,WANG Zhu jie,et al. Study on Engineering Geological Conditions of High Pressure Tunnel with Concrete Lining in Pumped Storage Plant[J]. Guangdong Water Resources and Hydropower,2006,(11)8-14.(in Chinese)[3]张有天.论有压隧洞最小覆盖厚度[J]. 水利学报,2002,(9)1-5.(ZHANG You tian. Minimum Overburden of Hydraulic Pressure Tunnel[J]. Journal of Hydraulic Engineering,2002,(9)1-5.(in Chinese)[4]刘允芳.岩体地应力与工程建设[M]. 武汉湖北科学技术出版社,2000.(LIU Yun fang. Geostress and Engineering Construction[M]. WuhanHubei Science and Technology Press,2000.(in Chinese)[5]李永松,尹健民,艾凯,等. 地应力回归分析方法与工程应用实例[J]. 长江科学院院报,2006,22(4)41-43,46.(LI Yong song,YIN Jian min,AI Kai,et al. Geostress Regression Analysis Method and Engineering Case Application[J]. Journal of Yangtze River Scientific Research Institute,2006,22(4)41-43,46.(in Chinese)[6]李永松,尹健民,刘元坤,等. 阳江抽水蓄能电站地应力场回归分析[J]. 武汉大学学报(工学版),2007,40(4)69-73.(LI Yong song,YIN Jian min,LIU Yuan kun,et al. Regression Analysis of In situ Stress Field for Yangjiang Pumped Storage Plant[J]. Engineering Journal of Wuhan University,2007,40(4)69-73.(in Chinese)[7]GB50218—94 ,工程岩体分级标准[S].北京中国计划出版社,1995.(GB50218—94,Standard for Engineering Classification of Rock Masses[S]. Beijing China Planning Press,1995.(in Chinese)[8]HARMAIER H H,DOE T W,DIXON G.Evaluation of Hydrojacking Tests for an Unlined Pressure Tunnel[J]. Tunneling and Underground Space Technology,1998,13(4)393-401.[9]郭喜峰,尹健民,李永松,等. 引汉济渭工程黄三隧洞地应力测试研究[J]. 地下空间与工程学报,2010,6(增2) 1629-1631,1635.(GUO Xi feng,YIN Jian min,LI Yong song,et al. Study on Crustal Stress Measurement at Huangsan Tunnel of Hanjiang to Weihe River Diversion Project[J]. Chinese Journal of Underground Space and Engineering,2010,6(Sup.2) 1629-1631,1635.(in Chinese)[10]SL279—2002,水工隧洞设计规范[S].北京中国水利水电出版社,2003.( SL279—2002,Specification for Design of Hydraulic Tunnel[S]. Beijing China Water Power Press,2003.(in Chinese)[11]尹健民,郭喜峰,艾凯 ,等.清远抽水蓄能电站地应力测试分析与高压隧洞设计验证[J]. 长江科学院院报,2008,25(5)43-45,83.(YIN Jian min,GUO Xi feng,AI Kai,et al. Analysis of In situ Stress Measurement and High Pressure Tunnel’s Design Verification for Qingyuan Pumped Storage Plant[J]. Journal of Yangtze River Scientific Research Institute,2008,25(5)43-45,83.( in Chinese)