Risk Management of Large Water Conservancy Projects

  • CHEN Jin
Expand
  • Administration Office, Yangtze River Scientific Research Institute, Wuhan 430010, China

Received date: 2012-10-26

  Online published: 2012-12-18

Abstract

China has the most water projects in the world. Owing to uncertainties of large water projects in particular, the engineering design, construction and running have huge impact on the national economy, social and ecological environment. On the basis of dam breaking cases in China and abroad, the risks in safety, society, and environment were analyzed. Risk factors of large water projects, risk classification and risk grade were discussed. With the Three Gorges Project as a case study, the risk factors and risk types of large water projects were discussed. Methods and strategies of risk control and risk management that are fit for China were also put forward.

Cite this article

CHEN Jin . Risk Management of Large Water Conservancy Projects[J]. Journal of Changjiang River Scientific Research Institute, 2012 , 29(12) : 15 -19 . DOI: 10.3969/j.issn.1001-5485.2012.12.004

Outlines

/

〈 〉