乌东德水电站右岸地下厂房施工期围岩稳定分析
麦锦锋, 李端有, 黄祥, 刘宝乐
Rock Stability of the Right Bank Underground Powerhouse of Wudongde Hydropower Station During Construction
MAI Jin-feng, LI Duan-you, HUANG Xiang, LIU Bao-le
长江科学院院报
.
2016, (5): 42
-47
.
DOI: 10.11988/ckyyb.20150075