[1] 高本虎. 橡胶坝工程技术指南[M]. 2版. 北京: 中国水利水电出版社, 2006. (GAO Ben-hu. Guidelines for Rubber Dam Engineering Technology[M]. 2nd ed. Beijing: China Water Power Press, 2006.(in Chinese))
[2] GB/T 50979—2014, 橡胶坝工程技术规范[S]. 北京: 中国计划出版社, 2014. (GB/T 50979—2014, Technical Code for Rubber Dam Engineering[S]. Beijing: China Planning Press, 2014. (in Chinese))
[3] 王溥文, 韩昌海, 童中山. 橡胶坝技术及应用[M]. 北京: 中国水利水电出版社, 2008. (WANG Pu-wen, HAN Chang-hai, TONG Zhong-shan. Rubber Dam Technology and its Application[M]. Beijing: China Water Power Press, 2008.(in Chinese))
[4] 李风增. 胶南市风河梯级橡胶坝综合管理与运用[J]. 中国水利, 2007(16): 65. (LI Feng-zeng. Comprehensive Management and Application of Fenghe Cascade Rubber Dam in Jiaonan City[J]. China Water Resources, 2007(16): 65.(in Chinese))
[5] 韩 飞. 橡胶坝充排水系统常见故障分析与维护措施探讨[J]. 中国水能及电气化, 2021(9): 12-14. (HAN Fei. Analysis on Common Faults of Rubber Dam Water Filling and Drainage System and Discussion of Maintenance Measures[J]. China Water Power & Electrification, 2021(9): 12-14.(in Chinese))
[6] 刘洪金. 简析密云区橡胶坝充排水系统常见故障分析与维护措施[J]. 农业开发与装备, 2022(9): 138-139. (LIU Hong-jin. Analysis of Common Faults in Filling and Drainage System of Rubber Dam in Miyun District and Maintenance Measures[J]. Agricultural Development & Equipments, 2022(9): 138-139.(in Chinese))
[7] 罗造时.橡胶坝充排水系统设计探讨[J].治淮,2016(6): 29-30.(LUO Zao-shi. Discussion on Design of Water Filling and Drainage System for Rubber Dam[J]. Zhihuai, 2016(6): 29-30.(in Chinese))
[8] 李秀娟. 充水橡胶坝工程中充排水系统设计[J]. 水利建设与管理, 2012, 32(4): 3-5. (LI Xiu-juan. Design of Water Filling and Drainage System in Water-filled Rubber Dam Project[J]. Water Resources Development & Management, 2012, 32(4): 3-5.(in Chinese))
[9] 沈源国. 大型多跨橡胶坝充排水系统的设计[J]. 水利水电技术, 2010, 41(11): 27-28, 33. (SHEN Yuan-guo. Design of Water Filling and Draining System for Large and Muti-span Rubble Dam[J]. Water Resources and Hydropower Engineering, 2010, 41(11): 27-28, 33.(in Chinese))
[10] 陈晓群, 石自堂, 林 琳. 浅析橡胶坝坝袋振动因素及设计管理[J]. 中国农村水利水电, 2003(2): 42-44. (CHEN Xiao-qun, SHI Zi-tang, LIN Lin. Analysis on Vibration Factors and Design Management of Rubber Dam Bag[J]. China Rural Water and Hydropower, 2003(2): 42-44.(in Chinese))
[11] SL 554—2011, 橡胶坝坝袋[S]. 北京: 中国水利水电出版社, 2012. (SL 554—2011, Rubber Dam Bag[S]. Beijing: China Water Power Press, 2012. (in Chinese))
[12] GB/T 50979—2014, 橡胶坝工程技术规范[S]. 北京: 中国计划出版社, 2014. (GB/T 50979—2014, Technical cocle for Rubber Dam Engineering[S]. Beijing: China Planning Press, 2014. (in Chinese))
[13] 王兴超. 基于生态水利的海绵城市设计原则[J]. 水土保持通报, 2017, 37(5): 250-254, 289. (WANG Xing-chao. Design Principle of Sponge City Based on Ecological Water Conservancy[J]. Bulletin of Soil and Water Conservation, 2017, 37(5): 250-254, 289.(in Chinese))
[14] 李 岩, 蔡 新, 崔朕铭, 等. 基于Mooney-Rivlin模型的充水式橡胶坝工作性态研究[J]. 水电能源科学, 2015, 33(4): 100-102, 138. (LI Yan, CAI Xin, CUI Zhen-ming, et al. Study on Working State of Water Filling Rubber Dam Based on Mooney-Rivlin Model[J]. Water Resources and Power, 2015, 33(4): 100-102, 138.(in Chinese))
[15] SL 214—2015, 水闸安全评价导则[S]. 北京: 中国水利水电出版社, 2015. (SL 214—2015, Guidelines for Sluice Safety Evaluation[S]. Beijing: China Water Power Press, 2015. (in Chinese))
[16] SL 75—2014, 水闸技术管理规程[S]. 北京: 中国水利水电出版社, 2014. (SL 75—2014, Code for Technical Management of Sluices[S]. Beijing: China Water Power Press, 2014. (in Chinese))
[17] ZHANG X Q, TAM P W M, ZHENG W. Construction, Operation, and Maintenance of Rubber Dams[J]. Canadian Journal of Civil Engineering, 2002, 29(3): 409-420.
[18] 陈玉辉. 橡胶坝不同运行高度对洪水风险的影响分析[J]. 西北水电, 2023(2): 6-11. (CHEN Yu-hui. Impact Analysis of Rubber Dam on Flood Risk[J]. Northwest Hydropower, 2023(2): 6-11.(in Chinese))
[19] 张庆华, 刁艳芳, 程传民, 等. 梯级橡胶坝塌坝泄流计算仿真系统[J]. 水利水电科技进展, 2014, 34(4): 53-56. (ZHANG Qing-hua, DIAO Yan-fang, CHENG Chuan-min, et al. Cascade Rubber Dams Fall Discharge Calculation Simulation System[J]. Advances in Science and Technology of Water Resources, 2014, 34(4): 53-56.(in Chinese))
[20] 张 靖, 沈欣菲, 周升龙, 等. 橡胶坝塌坝最大泄流量快速估算方法[J]. 长江科学院院报, 2020, 37(4): 62-66. (ZHANG Jing, SHEN Xin-fei, ZHOU Sheng-long, et al. Fast Estimation Method for Maximum Discharge of Rubber Dam Collapse[J]. Journal of Yangtze River Scientific Research Institute, 2020, 37(4): 62-66.(in Chinese))
[21] 陈 敏,李泽军.于桥水库果河橡胶坝塌坝运行时间分析[J].海河水利,2022(13):48-50. (CHEN Min,LI Ze-jun. Analysis of Operation Time for Collapse of Guohe Rubber Dam in Yuqiao Reservoir[J]. Haihe River Water Conservancy,2022(13):48-50.(in Chinese))
[22] 王兴超. 基于海绵城市理论的地下水库工程设计[J]. 长江科学院院报, 2018, 35(8): 34-39. (WANG Xing-chao. Engineering Design of Underground Reservoir Based on Sponge City Theory[J]. Journal of Yangtze River Scientific Research Institute, 2018, 35(8): 34-39.(in Chinese))
[23] 张世功, 孙廷玺, 段伟华, 等. 沂河梯级橡胶坝调度运用实况对洪水影响分析[J]. 治淮, 2010(5): 15-17.(ZHANG Shi-gong,SUN Ting-xi, DUAN Wei-hua. Analysis on the Influence of Operation of Yihe Cascade Rubber Dam on Flood[J]. Zhihuai, 2010(5): 15-17.(in Chinese))
[24] 陈界仁,赵悦君,任 磊,等.基于数学模型的沂河橡胶坝群塌坝方案[J].水利水电科技进展,2022,42(1):75-79.(CHEN Jie-ren,ZHAO Yue-jun,REN Lei,et al.Collapse Scheme of Rubber Dam Group in Yihe River Based on Numerical Model[J]. Advances in Science and Technology of Water Resources,2022,42(1):75-79.(in Chinese))
[25] 阎诗武.泄水结构振动振源分析(一)[J].人民珠江,1999(2):21-25. (YAN Shi-wu. Analysis of Vibration Sources of Release Work(I)[J]. Pearl River,1999(2):21-25. (in Chinese))
[26] 阎诗武.泄水结构振动振源分析(二)[J].人民珠江,1999(3):36-38. (YAN Shi-wu. Analysis of Vibration Sources of Release Work(II)[J]. Pearl River,1999(3):36-38. (in Chinese))
[27] CHERAGHI-SHIRAZI N, KABIRI-SAMANI A R, BOROOMAND B. Numerical Analysis of Rubber Dams Using Fluid-Structure Interactions[J]. Flow Measurement and Instrumentation, 2014, 40: 91-98.
[28] 林兰兰. 清河橡胶坝充排水管路设计及电气控制方式探析[J]. 地下水, 2022, 44(1): 274-275, 290. (LIN Lan-lan. Discussion on Design of Filling and Drainage Pipeline and Electrical Control Mode of Qinghe Rubber Dam[J]. Ground Water, 2022, 44(1): 274-275, 290.(in Chinese))
[29] ZHANG Q, DIAO Y. Cascade Rubber Dams Fall Discharge Calculation and Analysis[J]. Canadian Journal of Civil Engineering, 2011, 38(8): 957-962.
[30] 王兴超. 一种抽排橡胶坝积气和尾水系统: 中国,CN112813929B[P]. 2022-08-02. (WANG Xing-chao. A System of Pumping and Drainage for Accumulated Gas and Tailwater in Rubber Dam: China, CN112813929B[P]. 2022-08-02. (in Chinese))
[31] CONRAD D A, MULDOON D P. Design and Application of a PC/PLC Utility Rubber Dam Control System[J]. Instrument Society of America,1995(6):351-362.
[32] SL 265—2016, 水闸设计规范[S]. 北京: 中国水利水电出版社, 2017. (SL 265—2016, Code for Design of Sluice[S]. Beijing: China Water Power Press, 2017. (in Chinese))