[1] 吴宪生.台阶式溢流坝水力特性初探.四川水力发电,1998,17(1):73-77.(WU Xian-sheng. Elementary Study on Hydraulic Property of Stepped Spillway. Sichuan Water Power,1998, 17(1): 73-77. (in Chinese))
田嘉宁,魏炳乾,李布雳,等.台阶式溢流坝的时均压强特性 .水力发电学报, 2007,26(6):67-72. (TIAN Jia-ning, WEI Bing-qian, LI Bu-li, et al. The Characteristics of Mean Pressure on Stepped Overflow Dam. Journal of Hydroelectric Engineering, 2007, 26(6):67-72.(in Chinese))
李布雳,韩 玙,田嘉宁.台阶式溢流坝上压强特性的试验研究.西安:西安理工大学,2005. (LI Bu-li, HAN Yu, TIAN Jia-ning. Experimental Research of Pressure Characteristic on Stepped overflow dam. Xi’an: Xi’an University of Technology, 2005.(in Chinese))
JUNY M S,POMARES J,DOLZ J. Pressure Field in Skimming Flow over a Stepped Spillway∥Proceeding of the International Workshop on Hydraulics of Stepped Spillways. Edited by MINOR H E,HAGER W H.Rotterdam: A.A.Balkema, March 22-24, 2000: 137-145.
张志昌,曾东洋,郑阿漫,等.台阶式溢洪道滑行水流压强特性的试验研究.水动力学研究与进展:A辑,2003,18(5):652-659. (ZHANG Zhi-chang, ZENG Dong-yang, ZHENG A-man, et al. Experimental Investigation on the Pressure Characteristics of Skimming Flow on Stepped Spillways. Chinese Journal of Hydrodynamics: Ser. A, 2003, 18(5): 652-659.(in Chinese))
曾东洋,张志昌,刘亚菲,等.台阶式溢洪道滑行水流时均压强特性研究.陕西水利发电, 2001,17(4):11-14. (ZENG Dong-yang, ZHANG Zhi-chang, LIU Ya-fei, et al. Study on the Characteristics of Time-average Pressure of Skimming Flow in Stepped Spillway. Journal of Shaanxi Water Power, 2001,17(4): 11-14. (in Chinese))
杨 庆,戴光清. 阶梯溢流坝水力特性和消能机理试验研究 . 成都: 四川大学, 2002. (YANG Qing, DAI Guang-qing. Mode Test and Mechanism Research of the Stepped Overflow Spillway. Chengdu: Sichuan University, 2002. (in Chinese))
崔 瑞. 坡度对台阶水流无掺气段压强特性的影响研究. 甘肃水利水电技术, 2013, 49(9): 22-27. (CUI Rui. Research on Impact of Slope in the Nonaerated Region of Stepped Spillways. Gansu Water Conservancy and Hydropower Technology, 2013, 49(9): 22-27.(in Chinese))
郑阿漫,张志昌,李建中. 掺气分流墩台阶式溢洪道水力特性的研究. 西安:西安理工大学, 2001. (ZHENG A-man, ZHANG Zhi-chang, LI Jian-zhong. Hydraulics of Stepped Spillways with Aerated Splitter. Xi’an: Xi’an University of Technology, 2001.(in Chinese))
陈 群, 戴光清. 鱼背山水库岸边阶梯溢洪道流场的三维数值模拟. 水力发电学报, 2002,21(3):62-72. (CHEN Qun, DAI Guang-qing. Three-dimensional Numerical Simulation of the Stepped Spillway Overflow at the Yubeishan Reservoir. Journal of Hydroelectric Engineering, 2002, 21(3): 62-72. (in Chinese))
戴光清, 陈 群, 刘浩吾. 阶梯溢流坝面过渡阶梯最佳起始位置. 四川水力发电, 2001, 20(B07): 31-34. (DAI Guang-qing, CHEN Qun, LIU Hao-wu. Best Starting Position of Transitional Steps in Stepped Spillways. Sichuan Water Power, 2001, 20(B07): 31-34. in Chinese))
董志勇, 吕阳泉, 居文杰, 等. 高速水流空化区和空蚀区掺气特性的试验研究. 水力发电学报, 2006, 25(4): 62-65. (DONG Zhi-yong, LV Yang-quan, JU Wen-jie, et al. Experimental Study of Aerated Characteristics in Cavitation Region of High Velocity Flow. Journal of Hydroelectric Engineering, 2006,25(4):62-65. (in Chinese))