水土保持新技术与新方法

卵漂石铅丝笼在西藏水土流失治理工程中的应用

展开
  • 1.西藏自治区水土保持局,拉萨 850003;
    2.西藏自治区水文水资源勘测局,拉萨 850000
皇甫大林(1973-),男,江苏丰县人,高级工程师,长期从事水利水土保持工程勘察、设计、施工、管理和预防监督等工作,(电话)0891-6332649(电子信箱)523154928@qq.com。

收稿日期: 2015-01-16

  网络出版日期: 2015-03-06

Application of Gravel and Boulder Gabion in Soil Erosion Control Projects in Tibet

Expand
  • 1.Soil and Water Conservation Bureau of Tibet Autonomous Region, Lhasa 850003, China;
    2.Hydrology and Water Resources Survey Bureau of Tibet Autonomous Region, Lhasa 850000, China

Received date: 2015-01-16

  Online published: 2015-03-06

摘要

卵漂石铅丝石笼具有经济、简易、透水、柔性、美观等特点,现广泛应用于西藏水土流失治理项目中的拦挡、护岸、沟床固定等工程。应用结果表明:卵漂石铅丝笼用于西藏各行业开发建设项目的挡土墙、挡渣墙时,当拦挡高度h≤1.5 m时,可直接采用矩形、梯形、直角梯形断面;当拦挡高度1.5 m<h<5 m时,采用台阶矩形断面。卵漂石铅丝笼用于坝式护岸护滩工程时,断面多采用台阶梯形和梯形,基础埋深根据冲刷深度确定,若冲深>1.0 m,将基础埋深控制在1.0 m以内,0.5 m左右为宜。在顺直段、地基好、不宜受淘刷的河段,顺坝长度可根据铅丝笼每卷长度分段;在河流弯道和易发生不均匀沉降、易淘刷部位以8~15 m为宜。实践证明:卵漂石铅丝笼顺坝、丁坝具有良好的抗变形适应性和抗冲刷性,即使在山洪作用下基础被淘空导致整体垮塌的情况下仍能发挥作用,在汛后利用垮塌石笼作为基脚在其上补做护岸工程效果更佳。

本文引用格式

皇甫大林,雷晓洪,马波 . 卵漂石铅丝笼在西藏水土流失治理工程中的应用[J]. 长江科学院院报, 2015 , 32(3) : 125 -128 . DOI: 10.3969/j.issn.1001-5485.2015.03.025

Abstract

Gravel and boulder gabion, which is economical, simple, permeable, flexible, and aesthetic, is widely applied to the blocking, bank protection, and gully stabilization works of water and soil loss control projects in Tibet autonomous region in China. We summarize that when gravel and boulder gabion is applied to retaining walls in various construction projects in Tibet, if the retaining height h≤1.5m, the shape of gravel and boulder gabion’s cross-section can be rectangular, trapezoid, and right trapezoid; while when 1.5m<h<5m, stepped rectangular section can be adopted. Moreover, when gravel and boulder gabion is applied to bank protection and shoal protection works (spur dike and longitudinal dike), stepped trapezoid and trapezoid cross-sections are mostly adopted. The embedded depth of gabion is determined according to erosion depth. When erosion depth is larger than 1.0m, the embedded depth of gabion should be controlled within 1.0m, best around 0.5m. In straight river segments with good foundation and less scouring, the length of longitudinal dike can be partitioned into segments according to the length of gabions per roll; whereas in bending rivers with scouring and non-uniform settlement, the length of longitudinal dike is recommended to be 8-15m. Practice proved that longitudinal dike and spur dike made of gravel and boulder gabions have good resistance to deformation and erosion. They can also work even when the foundation is scoured and collapsed under mountain torrents. After mountain torrents, better effect can be obtained to make up further bank protection project on the basis of the collapsed gabions.

参考文献

[1] 胡甲均. 长江流域水土保持小型水利水保工程设计手册. 武汉: 长江出版社,2006. (HU Jia-jun. Manual of Small Water Conservation Engineering Design in Yangtze River Basin. Wuhan: Yangtze River Press, 2006. (in Chinese))
长江流域水土保持技术手册编辑委员会. 长江流域水土保持技术手册.北京:中国水利水电出版社,1999. (The Editorial Board. Soil and Water Conservation Technical Manual in Yangtze River Basin. Beijing: China Water Power Press,1999.(in Chinese))
陕西省水土保持勘测规划研究所.西藏曲水县茶巴朗水土流失综合治理示范工程初步设计报告.拉萨:西藏自治区水土保持局,2010. (Shannxi Provincial Institute of Soil and Water Conservation Survey and Design. Preliminary Design Report of Soil Erosion Comprehensive Control and Demonstration Project in Qushui County, Tibet. Lhasa: Bureau of Soil and Water Conservation of Tibet Autonomous Region, 2010.(in Chinese))
西藏自治区水土保持局. 西藏拉孜县曲下镇木村综合发展规划报告. 拉萨:西藏自治区水土保持局,2011. (Bureau of Soil and Water Conservation of Tibet Autonomous Region. Comprehensive Development Planning Report of Mu Village, Lazi County, Tibet. Lhasa: Bureau of Soil and Water Conservation of Tibet Autonomous Region, 2011. (in Chinese))
文章导航

/