[1] 黄永坚. 水库分层取水[M]. 北京:水利电力出版社,1986.(HUANG Yong-jian. Stratified Pumping of Reservoir[M]. Beijing:Water Resources and Electric Power Press,1986.(in Chinese))
[2] 游 湘,何月萍,王希成. 进水口叠梁门分层取水设计研究[J]. 水电站设计,2011,27(2):32-34.(YOU Xiang,HE Yue-ping,WANG Xi-cheng. Research on Design for Stratified Pumping of Water Intake Stoplog Gate[J]. Design of Hydroelectric Power Station,2011,27(2):32-34.(in Chinese))
[3] 杜效鹄,喻卫奇,芮建良. 水电生态实践—分层取水结构[J]. 水力发电,2008,34(12):28-32.(DU Xiao-hu,YU Wei-qi,RUI Jian-liang. Hydropower Ecology Practice:Selective Withdrawal Structures[J]. Water Power,2008,34(12):28-32.(in Chinese))
[4] 陆俊卿,张小峰,强继红,等. 水库水温数学模型及其应用[J]. 水力发电学报,2008,27(5):123-129.(LU Jun-qing,ZHANG Xiao-feng,QIANG Ji-hong,et al. Numerical Model for Temperature Simulation of Water in Reservoir[J]. Journal of Hydroelectric Engineering,2008,27(5):123-129.(in Chinese))
[5] 汤世飞. 光照水电站叠梁门分层取水运行情况分析[J]. 贵州水力发电,2011,25(4):18-21.(TANG Shi-fei. Analysis of Stratified Pumping Operation of Stoplog Gate in Guangzhao Hydropower Station[J]. Guizhou Water Power,2011,25(4):18-21.(in Chinese))
[6] 刘 欣,陈能平,肖德序,等. 光照水电站进水口分层取水设计[J]. 贵州水力发电,2008,22(5):33-35.(LIU Xin,CHEN Neng-ping,XIAO De-xu,et al. Design of Taking Water from Different Level for Inlet of Guangzhao Hydropower Station[J]. Guizhou Water Power,2008,22(5):33-35.(in Chinese))
[7] 杨芳丽,张小峰,谈广鸣,等. 滩坑水库建成后下游河道水温的预测[J]. 武汉大学学报:工学版,2008,41(1):40-44.(YANG Fang-li,ZHANG Xiao-feng,TAN Guang-ming,et al. Prediction of Water Temperature in Downstream Reach of Tankeng Hydropower Station[J]. Engineering Journal of Wuhan University,2008,41(1):40-44.(in Chinese))
[8] BOHAN J P,GRACE J L. Selective Withdrawal from Man-made Lakes[R]. Vicksburg:U.S. Army Engineer Waterways Experiment Station,1973.
[9] KUBITSCHEK J. Hungry Horse Selective Withdrawal Hydraulic Model Study[R]. Washington:U.S. Department of the Interior,1994.
[10]RYAN T, TODD C, NICOL S. Implications of Cold Water Releases for Freshwater Fish Populations[C]∥ANCOLD. Proceedings of the ANCOLD 2002 Conference on Dams: Dams-Future Directions in Demanding Environments, Adelaide, Brisbane, October 19-25, 2002: 1-9.
[11]高学平,张少雄,张 晨. 糯扎渡水电站多层进水口下泄水温三维数值模拟[J]. 水力发电学报,2012,31(1):195-201.(GAO Xue-ping,ZHANG Shao-xiong,ZHANG Chen. 3D Numerical Simulation of Water Temperature Released from Multi-level Intake of Nuozhadu Hydropower Station[J]. Journal of Hydroelectric Engineering,2012,31(1):195-201.(in Chinese))
[12]高学平,陈 弘,宋慧芳. 水电站叠梁门多层取水下泄水温公式[J]. 中国工程科学,2011,13(12):63-67.(GAO Xue-ping,CHEN Hong,SONG Hui-fang. A Prediction Formula of Water Temperature Released from the Multi-level Stop-log Gate Intake of Hydropower Stations[J]. Engineering Science,2011,13(12):63-67.(in Chinese))
[13]柳海涛,孙双科,王晓松,等. 大型深水库分层取水水温模型试验研究[J]. 水力发电学报,2012,31(1):129-134.(LIU Hai-tao,SUN Shuang-ke,WANG Xiao-song,et al. Water Temperature Model Test for a Multi-level Power Intake of Large Deep Reservoir[J]. Journal of Hydroelectric Engineering,2012,31(1):129-134.(in Chinese))
[14]张士杰,彭文启,刘昌明. 高坝大库分层取水措施比选研究[J]. 水利学报,2012,43(6):653-658.(ZHANG Shi-jie,PENG Wen-qi,LIU Chang-ming. Alternative Withdrawal Schemes for Layered Water in Large Reservoir[J]. Journal of Hydraulic Engineering,2012,43(6):653-658.(in Chinese))
[15]张陆良,孙大东. 高坝大水库下泄水水温影响及减缓措施初探[J]. 水电站设计,2009,25(1):76-78.(ZHANG Lu-liang,SUN Da-dong. Tentative Enquiry into High Dam Large Reservoir Flow Discharge Water Temperature Effect and Mitigation[J]. Design of Hydroelectric Power Station,2009,25(1):76-78.(in Chinese))
[16]任华堂,陶 亚,夏建新. 不同取水口高程对阿海水库水温分布的影响[J]. 应用基础与工程科学学报,2010,18(7):84-91.(REN Hua-tang,TAO Ya,XIA Jian-xin. Influence of Different Intake Elevations on Water Temperature of Ahai Reservoir[J]. Journal of Basic Science and Engineering,2010,18(7):84-91.(in Chinese))
[17]姜跃良,何 涛. 金沙江溪洛渡水电站进水口分层取水措施设计[J]. 水资源保护,2011,27(5):119-122.(JIANG Yue-liang,HE Tao. Design of Stratified Water Withdrawal Structure of Xiluodu Hydropower Station on Jinsha River[J]. Water Resources Protection,2011,27(5):119-122.(in Chinese))
[18]章晋雄,张 东,吴一红,等. 锦屏一级水电站分层取水叠梁门进水口水力特性研究[J]. 水力发电学报,2010,29(2):1-6.(ZHANG Jin-xiong,ZHANG Dong,WU Yi-hong,et al. Hydraulic Characteristics of Stoplog Gate of Stratified Water Withdrawal Structure at Inlet of Xiluodu Hydropower Station[J]. Journal of Hydroelectric Engineering,2010,29(2):1-6.(in Chinese))
[19]游 湘,唐碧华,章晋雄,等. 锦屏一级水电站进水口叠梁门分层取水结构对流态及结构安全的影响[J]. 水利水电科技进展,2010,30(4):46-50.(YOU Xiang,TANG Bi-hua,ZHANG Jin-xiong,et al. Influence of Multi-level Intake Structure of Stoplog Gate at Inlet of Jinping I Hydropower Station on River Regime[J]. Advances in Science and Technology of Water Resources,2010,30(4):46-50.(in Chinese))
[20]雷 艳,李进平,求晓明. 大型水电站分层取水进水口水力特性的研究[J]. 水力发电学报,2010,29(5):209-215.(LEI Yan,LI Jin-ping,QIU Xiao-ming. Study on Hydraulic Characteristics of Multi-elevations Intake of Large-scale Hydropower Station[J]. Journal of Hydroelectric Engineering,2010,29(5):209-215.(in Chinese))