收稿日期: 2012-02-13
修回日期: 2013-04-09
网络出版日期: 2013-04-09
基金资助
国家科技支撑计划专项(2012BAH10B00)
Application of Digital Construction Management System to Dagangshan Hydropower Station
Received date: 2012-02-13
Revised date: 2013-04-09
Online published: 2013-04-09
余学农 , 王路 , 饶小康 . 施工管理数字化体系在大岗山水电站的运用[J]. 长江科学院院报, 2013 , 30(4) : 98 -102 . DOI: 10.3969/j.issn.1001-5485.2013.04.020
A digital construction management system which integrates computer technology, GIS technology, database technology, and wireless sensor network technology is introduced, and its application to the Dagangshan Hydropower Station is described. Functions inclusive of 3-D visual simulation, construction grouting, concrete temperature control and safe blasting monitoring are elaborated in detail. With this system, a data collection mode which fits the dam construction characteristics is established. Moreover, 3-D visual query, query and analysis of concrete temperature control, as well as process control and quality management for foundation treatment works are also accomplished. Digital system could realize the management and sharing of centralized data, enhance the standardization, refinement and personalization of the construction site, and provide technical support for the decision-making of hydropower construction.
/
| 〈 |
|
〉 |