[an error occurred while processing this directive]
JOURNAL OF YANGTZE RIVER SCIENTIFIC RESEARCH INSTI  2013, Vol. 30 Issue (8): 18-20    DOI: 10.3969/j.issn.1001-5485.2013.08.0;2013,30(08)
Orignal Article Current Issue| Next Issue| Archive| Adv Search |
Optimization of the Operation of Valve in the Sixth-step ShiplockHead of Three Gorges Project
JIANG Yao-zu1, WU Ying-zhuo1, CHEN Hui1, YU San-da2, GENG Jun2
1.Hydraulics Department, Yangtze River Scientific Research Institute, Wuhan 430010,China;
2. Three Gorges Project Construction Operation Authority of China Three Gorges Corporation,Yichang 443133, China

[an error occurred while processing this directive]